Folgen
abdul kadir Marsono
abdul kadir Marsono
dr associate professor
Bestätigte E-Mail-Adresse bei utm.my - Startseite
Titel
Zitiert von
Zitiert von
Jahr
Identifying and assessing the critical factors for effective implementation of safety programs in construction projects
A Bavafa, A Mahdiyar, AK Marsono
Safety science 106, 47-56, 2018
1612018
Combinations of building construction material for residential building for the global warming mitigation for Malaysia
AKB Marsono, AT Balasbaneh
Construction and Building Materials 85, 100-108, 2015
932015
Sustainability choice of different hybrid timber structure for low medium cost single-story residential building: Environmental, economic and social assessment
AT Balasbaneh, AKB Marsono, SJ Khaleghi
Journal of Building Engineering 20, 235-247, 2018
832018
Optimization of building energy performance through passive design strategies
H Omrany, AK Marsono
British Journal of Applied Science & Technology 13 (6), 1-16, 2015
712015
Barriers to implementation of building information modeling in scheduling and planning phase in Iran
I Kiani, AN Sadeghifam, SK Ghomi, AKB Marsono
Australian Journal of Basic and Applied Sciences 9 (5), 91-97, 2015
672015
Flexural performance of a precast concrete slab with steel fiber concrete topping
FR Mansour, SA Bakar, IS Ibrahim, AK Marsono, B Marabi
Construction and building materials 75, 112-120, 2015
622015
Sustainable materials selection based on flood damage assessment for a building using LCA and LCC
AT Balasbaneh, AKB Marsono, A Gohari
Journal of Cleaner Production 222, 844-855, 2019
582019
Strategies for reducing greenhouse gas emissions from residential sector by proposing new building structures in hot and humid climatic conditions
AT Balasbaneh, AKB Marsono
Building and Environment 124, 357-368, 2017
572017
Applying multi-criteria decision-making on alternatives for earth-retaining walls: LCA, LCC, and S-LCA
AT Balasbaneh, AKB Marsono
The International Journal of Life Cycle Assessment 25, 2140-2153, 2020
432020
New residential construction building and composite post and beam structure toward global warming mitigation
AT Balasbaneh, AK Bin Marsono
Environmental Progress & Sustainable Energy 37 (4), 1394-1402, 2018
302018
Wide beam shear behavior with diverse types of reinforcement
SE Mohammadyan-Yasouj, AK Marsono, R Abdullah, M Moghadasi
ACI Structural Journal 112 (2), 199-208, 2015
262015
Economic comparison of industrialized building system and conventional construction system using building information modeling
A Faghirinejadfard, A Mahdiyar, AK Marsono, SR Mohandes, H Omrany, ...
J. Teknol 78, 195-207, 2016
252016
Energy analysis of wall materials using building information modeling (BIM) of public buildings in the tropical climate countries
AN Sadeghifam, AK Marsono, I Kiani, U Isikdag, AA Bavafa, ...
Jurnal Teknologi 78 (10), 35-41, 2016
222016
Experimental study of masonry infill reinforced concrete frames with and without corner openings
HR Khoshnoud, K Marsono
Structural Engineering and Mechanics 57 (4), 641-656, 2016
222016
Balancing of life cycle carbon and cost appraisal on alternative wall and roof design verification for residential building
A Tighnavard Balasbaneh, AK Bin Marsono, E Kasra Kermanshahi
Construction Innovation 18 (3), 274-300, 2018
212018
Flexural strength of special reinforced lightweight concrete beam for Industrialised Building System (IBS)
CC Yip, AK Marsono, JY Wong, MYH Amran
J. Teknol 77, 187-196, 2015
212015
Correlation of stiffness and natural frequency of precast frame system
A Javanmardi, R Abadi, AK Marsono, M Md Tap, Z Ibrahim, A Ahmad
Applied mechanics and materials 735, 141-144, 2015
202015
Applying three pillar indicator assessments on alternative floor systems: Life cycle study
AT Balasbaneh, D Yeoh, MI Juki, A Gohari, ARZ Abidin, AKB Marsono
The International Journal of Life Cycle Assessment 26, 1439-1455, 2021
182021
Analysis of reinforced concrete coupled shear wall structures
NK Subedi, AK Marsono, G Aguda
The Structural Design of Tall Buildings 8 (2), 117-143, 1999
181999
Critical success factor for industrialized building system process protocol map by lean construction management
T Nasrollahzadeh, AK Marsono, MM Tap
Journal of Civil & Environmental Engineering 6 (05), 2016
172016
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20