Underground excavation behaviour of the Queenston formation: tunnel back analysis for application to shaft damage dimension prediction MA Perras, H Wannenmacher, MS Diederichs Rock Mechanics and Rock Engineering 48, 1647-1671, 2015 | 34 | 2015 |
RETRACTED: Investigating high-strength expanded polystyrene (HS-EPS) as yielding support elements for tunnelling in squeezing ground conditions M Entfellner, P Hamdi, X Wang, H Wannenmacher, F Amann Tunnelling and Underground Space Technology 118, 104186, 2021 | 10 | 2021 |
Improved pressure tunnel lining methods, a case study of the Niagara Tunnel Facility Project H Wannenmacher, H Krenn, N Komma World Tunnel Congress, 2013 | 10 | 2013 |
Water ingress and reduction measures in the headrace tunnel at the Uma Oya multipurpose project H Wannenmacher, AH Hosseini, D Wenner, A Rahbar, Z Shahrokhi Hydro 2016, 1-6, 2016 | 8 | 2016 |
The Niagara Tunnel Facility Project–Technical and economical aspects of passive prestressed pressure tunnels H Wannenmacher Swiss Tunnel Congress. Lucerne, 2012 | 7 | 2012 |
Drilling and grouting works for pressurised groundwater conditions of the semmering base tunnel H Wannenmacher, M Entfellner, H Hauer Geotechnical and Geological Engineering 40 (9), 4377-4391, 2022 | 4 | 2022 |
Operational analyses of pressure tunnel and shaft grouting operations H Wannenmacher, A Heizmann, S Sabew EUROCK 2015 & 64th Geomechanics Colloquium, 6, 2015 | 4 | 2015 |
Rock mechanical aspects for cavern stability T Pilgerstorfer, H Wannenmacher, K Grossauer, A Stucki, B Schwegler ISRM EUROCK, ISRM-EUROCK-2013-018, 2013 | 4 | 2013 |
Back analysis of rock mass behavior of the Quintner Limestone at the Gonzen mine near Sargans, Switzerland MA Perras, E Ghazvinian, MS Diederichs, F Amann, H Wannenmacher ISRM EUROCK, ISRM-EUROCK-2013-072, 2013 | 4 | 2013 |
Improved monitoring systems for pre‐stressing of water tunnels/Weiterentwicklung der Vermessungssysteme für Vorspanninjektionen von Wasserstollen H Krenn, N Komma, H Wannenmacher Geomechanics and Tunnelling 4 (5), 605-607, 2011 | 4 | 2011 |
Technical challenges during construction of Alborz service tunnel, Iran D Wenner, H Wannenmacher Geomechanik und Tunnelbau: Geomechanik und Tunnelbau 1 (6), 537-542, 2008 | 4 | 2008 |
Investigating High-Strength Expanded Polystyrene (HS-EPS) as yielding support elements for tunnelling in squeezing ground conditions M Entfellner, P Hamdi, X Wang, H Wannenmacher, F Amann Tunnelling and Underground Space Technology 140, 105261, 2023 | 3 | 2023 |
Demands on digital data capturing of TBM and conventional tunnel drives N Sabanovic, H Wannenmacher, F Stauch, W Fentzloff Geomechanics and Tunnelling 15 (2), 207-214, 2022 | 3 | 2022 |
Baulos SBT3. 1: Bohr-/und Injektionsarbeiten für den Schacht Sommerau 2 H Wannenmacher, R Pfeffer, A Walter, B Christöphl ÖGG Spezialseminar Injektionen, https://s3. nl-ams. scw. cloud/assets. oegg …, 2017 | 3 | 2017 |
Construction of shallow caverns in blocky ground H Wannenmacher, F Grünenfelder, F Amann, EA Button ISRM EUROCK, ISRM-EUROCK-2010-117, 2010 | 3 | 2010 |
The drilling and grouting works at contract SBT 1.1–Tunnel Gloggnitz H Hauer, Z Ekici, M Entfellner, A Puttinger, S Passmann, T Hofmann, ... Geomechanics and Tunnelling 15 (5), 562-570, 2022 | 2 | 2022 |
Considerations for rock mass grouting for tunnelling in faulted rock masses with tubes á manchette H Wannenmacher, M Entfellner, H Krenn Geomechanics and Tunnelling 12 (2), 158-167, 2019 | 2 | 2019 |
Geotechnical observations from the Niagara Tunnel Project: Numerical back analysis for application to shaft damage dimension prediction MA Perras, MS Diederichs, H Wannenmacher Austrian Society for Geomechanics, Annual Congress, 2015 | 2 | 2015 |
Deformation measurement and long‐term behaviour of passively prestressed pressure tunnels through the example of the Niagara Tunnel Facility Project/Verformungsmessung und … H Krenn, M Roner, M Bauert, H Wannenmacher Geomechanics and Tunnelling 6 (5), 398-406, 2013 | 2 | 2013 |
Design aspects for concrete lined vertical shafts for hydropower constructions H Wannenmacher, M Bauert, F Amann ISRM EUROCK, ISRM-EUROCK-2012-149, 2012 | 2 | 2012 |