Solution approaches for the soft drink integrated production lot sizing and scheduling problem D Ferreira, R Morabito, S Rangel European Journal of Operational Research 196 (2), 697-706, 2009 | 227 | 2009 |
Heuristic approaches for the multiperiod location-transportation problem with reuse of vehicles in emergency logistics A Moreno, D Alem, D Ferreira Computers & Operations Research 69, 79-96, 2016 | 151 | 2016 |
Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants D Ferreira, R Morabito, S Rangel Computers & Operations Research 37 (4), 684-691, 2010 | 134 | 2010 |
Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production D Ferreira, AR Clark, B Almada-Lobo, R Morabito International Journal of Production Economics 136 (2), 255-265, 2012 | 102 | 2012 |
Building disaster preparedness and response capacity in humanitarian supply chains using the Social Vulnerability Index D Alem, HF Bonilla-Londono, AP Barbosa-Povoa, S Relvas, D Ferreira, ... European Journal of Operational Research 292 (1), 250-275, 2021 | 72 | 2021 |
Optimization model for a production, inventory, distribution and routing problem in small furniture companies PL Miranda, R Morabito, D Ferreira Top 26, 30-67, 2018 | 53 | 2018 |
Um modelo de otimização inteira mista e heurísticas relax and fix para a programação da produção de fábricas de refrigerantes de pequeno porte D Ferreira, R Morabito, S Rangel Production 18, 76-88, 2008 | 35 | 2008 |
A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning A Toscano, D Ferreira, R Morabito Flexible Services and Manufacturing Journal 31, 142-173, 2019 | 29 | 2019 |
Using the maximal covering location problem to design a sustainable recycling network XD Medrano-Gómez, D Ferreira, EAV Toso, OJ Ibarra-Rojas Journal of Cleaner Production 275, 124020, 2020 | 21 | 2020 |
Formulation and MIP-heuristics for the lot sizing and scheduling problem with temporal cleanings A Toscano, D Ferreira, R Morabito Computers & Chemical Engineering 142, 107038, 2020 | 19 | 2020 |
Um modelo de dimensionamento de lotes para uma fábrica de refrigerantes MS Rangel, D Ferreira Trends in Computational and Applied Mathematics 4 (2), 237-246, 2003 | 19 | 2003 |
Usando o ATSP na modelagem do problema integrado de produção de bebidas CM Defalque, S Rangel, D Ferreira TEMA (São Carlos) 12, 195-209, 2011 | 15 | 2011 |
Mixed integer formulations for a coupled lot-scheduling and vehicle routing problem in furniture settings PL Miranda, R Morabito, D Ferreira INFOR: Information Systems and Operational Research 57 (4), 563-596, 2019 | 14 | 2019 |
A study of different subsequence elimination strategies for the soft drink production planning M Maldonado, S Rangel, D Ferreira Journal of applied research and technology 12 (4), 631-641, 2014 | 12 | 2014 |
Heuristics and meta-heuristics for lot sizing and scheduling in the soft drinks industry: a comparison study D Ferreira, PM França, A Kimms, R Morabito, S Rangel, CFM Toledo Metaheuristics for Scheduling in Industrial and Manufacturing Applications …, 2008 | 11 | 2008 |
Formulações monoestágio para o problema de programação da produção de bebidas dois estágios com sincronia D Ferreira, B Almada-Lobo, R Morabito Production 23, 107-119, 2013 | 10 | 2013 |
Um modelo de dimensionamento de lotes aplicado à indústria de bebidas S Rangel, D Ferreira TEMA–Tendências em Matemática Aplicada 4 (2), 237-246, 2003 | 7 | 2003 |
A bi-objective model for the location of relief centers and distribution of commodities in disaster response operations A Moreno, D Ferreira, D Alem dyna 84 (200), 356-366, 2017 | 5 | 2017 |
Uma reformulação mono estágio de um modelo de programação da produção de bebidas dois estágios com sincronia D Ferreira, AR Clark, B Almada-Lobo, R Morabito XLI Simpósio Brasileiro de Pesquisa Operacional, 2009 | 5 | 2009 |
A heuristic approach to optimize the production scheduling of fruit-based beverages A Toscano, D Ferreira, R Morabito, M Trassi Gestão & Produção 27 (4), e4869, 2020 | 2 | 2020 |