Folgen
Justus Arne Schwarz
Justus Arne Schwarz
Bestätigte E-Mail-Adresse bei ur.de - Startseite
Titel
Zitiert von
Zitiert von
Jahr
Performance analysis of time-dependent queueing systems: Survey and classification
JA Schwarz, G Selinka, R Stolletz
Omega 63, 170-189, 2016
1242016
The buffer allocation problem in production lines: Formulations, solution methods, and instances
S Weiss, JA Schwarz, R Stolletz
IISE Transactions 51 (5), 456-485, 2019
992019
Optimal sales and production rollover strategies under capacity constraints
JA Schwarz, B Tan
European Journal of Operational Research 294 (2), 507-524, 2021
202021
Performance evaluation of a transportation-type bulk queue with generally distributed inter-arrival times
JA Schwarz, M Epp
International Journal of Production Research 54 (20), 6251-6264, 2016
122016
Storage technologies for wind power in the Columbia River Gorge
TU Daim, D Lim, FA Gomez, J Schwarz, S Jovanovic
International Journal of Sustainable Energy 33 (1), 1-15, 2014
122014
Buffer allocation problems for stochastic flow lines with unreliable machines
S Weiss, JA Schwarz, R Stolletz
Proceedings of the 10th conference on stochastic models of manufacturing and …, 2015
72015
Approximations of time-dependent unreliable flow lines with finite buffers
S Göttlich, S Kühn, JA Schwarz, R Stolletz
Mathematical Methods of Operations Research 83, 295-323, 2016
62016
A sampling approach for the analysis of time-dependent stochastic flow lines
JA Schwarz, R Stolletz
Catholic Univ., 2013
62013
A general model for batch building processes under the timeout and capacity rules
JA Schwarz, JS née Matzka, E Özden
Annals of Operations Research 231 (1), 5-31, 2015
42015
Analysis of buffer allocations in time-dependent and stochastic flow lines
JA Schwarz
22015
Warteschlangentheorie in der Betriebswirtschaftslehre
JA Schwarz, R Stolletz
Wirtschaftswissenschaftliches Studium: WiSt 42 (5), 261-264, 2013
12013
Availability
JA Schwarz
Integrated Design Engineering: Interdisciplinary and Holistic Product …, 2020
2020
Management von Produktionsanläufen
JA Schwarz, R Stolletz
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–13