Follow
Behrooz Karimi
Title
Cited by
Cited by
Year
The capacitated lot sizing problem: a review of models and algorithms
B Karimi, SMTF Ghomi, JM Wilson
Omega 31 (5), 365-378, 2003
9972003
Long -Term Open Pit Mine Production Planning : A Review of Models and Algorithms
M Osanloo, J nejad, b. karimi
International Journal of Mining Reclamation and Environment, 2007
2542007
Reverse logistics network design using simulated annealing
MS Pishvaee, K Kianfar, B Karimi
The International Journal of Advanced Manufacturing Technology 47, 269-281, 2010
2482010
Deriving preference order of open pit mines equipment through MADM methods: Application of modified VIKOR method
AA Bazzazi, M Osanloo, B Karimi
Expert Systems with Applications 38 (3), 2550-2556, 2011
2212011
A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes
AH Kashan, B Karimi, M Jenabi
Computers & Operations Research 35 (4), 1084-1098, 2008
1952008
A discrete particle swarm optimization algorithm for scheduling parallel machines
AH Kashan, B Karimi
Computers & Industrial Engineering 56 (1), 216-223, 2009
1812009
Multi-objective green supply chain optimization with a new hybrid memetic algorithm using the Taguchi method
R Jamshidi, SMTF Ghomi, B Karimi
Scientia Iranica 19 (6), 1876-1886, 2012
1742012
Closed-loop supply chain network design under a fuzzy environment
M Ramezani, AM Kimiagari, B Karimi, TH Hejazi
Knowledge-Based Systems 59, 108-120, 2014
1682014
A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains
SA Torabi, SMTF Ghomi, B Karimi
European Journal of Operational Research 173 (1), 173-189, 2006
1562006
Particle swarm algorithm for solving systems of nonlinear equations
M Jaberipour, E Khorram, B Karimi
Computers & Mathematics with Applications 62 (2), 566-576, 2011
1412011
Multi-period sustainable and integrated recycling network for municipal solid waste–A case study in Tehran
AM Harijani, S Mansour, B Karimi, CG Lee
Journal of Cleaner Production 151, 96-108, 2017
1312017
Closed-loop supply chain network design: A financial approach
M Ramezani, AM Kimiagari, B Karimi
Applied Mathematical Modelling 38 (15-16), 4099-4119, 2014
1302014
Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates
M Ebrahimi, SMTF Ghomi, B Karimi
Applied mathematical modelling 38 (9-10), 2490-2504, 2014
1212014
Optimizing the pricing and replenishment policy for non-instantaneous deteriorating items with stochastic demand and promotional efforts
R Maihami, B Karimi
Computers & Operations Research 51, 302-312, 2014
1192014
Manufacturer–retailer supply chain coordination: A bi-level programming approach
AN Sadigh, M Mozafari, B Karimi
Advances in Engineering Software 45 (1), 144-152, 2012
1132012
Effective hybrid genetic algorithm for minimizing makespan on a single-batch-processing machine with non-identical job sizes
AH Kashan, B Karimi, F Jolai
International Journal of Production Research 44 (12), 2337-2360, 2006
1082006
To Develop a Third Party Reverse Logistics Network for End-of-Life Vehicles in Iran
M mahmodzad, s. mansour, b. karimi
RESOURCES CONSERVATION AND RECYCLING 78 (0921-3449), 1-14, 2013
1062013
A branch and price algorithm to minimize makespan on a single batch processing machine with non-identical job sizes
NR Parsa, B Karimi, AH Kashan
Computers & Operations Research 37 (10), 1720-1730, 2010
1032010
Designing a Reverse Logistics Network for End‐of‐Life Vehicles Recovery
M Zarei, S Mansour, A Husseinzadeh Kashan, B Karimi
Mathematical Problems in Engineering 2010 (1), 649028, 2010
972010
The common cycle economic lot scheduling in flexible job shops: The finite horizon case
SA Torabi, B Karimi, SMTF Ghomi
International Journal of Production Economics 97 (1), 52-65, 2005
972005
The system can't perform the operation now. Try again later.
Articles 1–20