Solving permutation flow shop scheduling problem with sequence-independent setup time J Belabid, S Aqil, K Allali Journal of Applied Mathematics 2020, 1-11, 2020 | 45 | 2020 |
Two efficient nature inspired meta-heuristics solving blocking hybrid flow shop manufacturing problem S Aqil, K Allali Engineering Applications of Artificial Intelligence 100, 104196, 2021 | 31 | 2021 |
Distributed no-wait flow shop problem with sequence dependent setup time: Optimization of makespan and maximum tardiness K Allali, S Aqil, J Belabid Simulation Modelling Practice and Theory 116, 102455, 2022 | 22 | 2022 |
Local search metaheuristic for solving hybrid flow shop problem in slabs and beams manufacturing S Aqil, K Allali Expert Systems with Applications 162, 113716, 2020 | 22 | 2020 |
On a bi-criteria flow shop scheduling problem under constraints of blocking and sequence dependent setup time S Aqil, K Allali Annals of Operations Research 296 (1), 615-637, 2021 | 21 | 2021 |
Online fake news detection using machine learning techniques: a systematic mapping study M Lahby, S Aqil, WMS Yafooz, Y Abakarim Combating fake news with computational intelligence techniques, 3-37, 2022 | 18 | 2022 |
Three metaheuristics for solving the flow shop problem with permutation and sequence dependent setup time S Aqil, K Allali 2018 4th International Conference on Optimization and Applications (ICOA), 1-6, 2018 | 9 | 2018 |
Nash equilibrium inspired greedy search for solving flow shop scheduling problems J Belabid, S Aqil, K Allali Applied Intelligence 53 (11), 13415-13431, 2023 | 3 | 2023 |
On VNS-GRASP and iterated greedy metaheuristics for solving hybrid flow shop scheduling problem with uniform parallel machines and sequence independent setup time S Aqil, K Allali Heuristics for optimization and learning, 17-32, 2021 | 3 | 2021 |
Solving flow shop problem with permutation and sequence independent setup time J Belabid, S Aqil, K Allali 2019 5th International Conference on Optimization and Applications (ICOA), 1-5, 2019 | 3 | 2019 |
Inspired Nature Meta-Heuristics Minimizing Total Tardiness for Manufacturing Flow Shop Scheduling under Setup Time Constraint O Nejjarou, S Aqil, M Lahby International Conference on Digital Technologies and Applications, 44-54, 2023 | 1 | 2023 |
Constructive heuristics and mathematical formulation for solving the permutation flow shop scheduling problem with setup time O Nejjarou, S Aqil, M Lahby 2022 IEEE 3rd International Conference on Electronics, Control, Optimization …, 2022 | 1 | 2022 |
On permutation flow shop scheduling problem with sequence-independent setup time and total flow time H Sadki, J Belabid, S Aqil, K Allali International Conference on Advanced Technologies for Humanity, 507-518, 2021 | 1 | 2021 |
Heuristics and metaheuristics for the bi-criterion optimization of the flexible flow shop scheduling problem with two stages S Aqil, K Allali 2018 International Conference on Electronics, Control, Optimization and …, 2018 | 1 | 2018 |
Effective Population-Based Meta-heuristics with NEH and GRASP Heuristics Minimizing Total Weighted flow Time in No-Wait Flow Shop Scheduling Problem Under Sequence-Dependent … S Aqil Arabian Journal for Science and Engineering, 1-24, 2024 | | 2024 |
Improvement artificial bee colony meta-heuristic for solving manufacturing flow-shop scheduling problem under blocking constraint O Nejjarou, S Aqil, M Lahby 2023 14th International Conference on Intelligent Systems: Theories and …, 2023 | | 2023 |
Minimizing Maximum Tardiness in a Distributed Flow Shop Manufacturing Problem under No-Waiting and Sequence Dependent Setup Time Constraints A Sayah, S Aqil, M Lahby 2023 14th International Conference on Intelligent Systems: Theories and …, 2023 | | 2023 |
Multi-Objective Optimization Flow Shop Scheduling Problem Solving the Makespan and Total Flow Time with Sequence Independent Setup Time H Sadki, S Aqil, J Belabid, K Allali Journal of Advanced Manufacturing Systems, 1-22, 2023 | | 2023 |
Modeling and Solving the Fake News Detection Scheduling Problem S Aqil, M Lahby Combating Fake News with Computational Intelligence Techniques, 231-242, 2022 | | 2022 |
Minimizing makespan in permutation flow shop scheduling problem S Aqil, K Allali M. Kabil, N. Moussaid and A. Taik Co-chairs of the organizing committee, 105, 2019 | | 2019 |