Modeling a multi-criteria decision support system for prequalification assessment of construction contractors using CRITIC and EDAS models MG Naik, R Kishore, SAM Dehmourdi Operational Research in Engineering Sciences: Theory and Applications 4 (2 …, 2021 | 39 | 2021 |
Time and cost analysis for highway road construction project using artificial neural networks MG Naik, V Radhika Journal of Construction Engineering and Project Management 5 (1), 26-31, 2015 | 32 | 2015 |
Finite element method and GIS based distributed model for soil erosion and sediment yield in a watershed MG Naik, EP Rao, TI Eldho Water resources management 23, 553-579, 2009 | 21 | 2009 |
Designing a framework for Subcontractor’s selection in construction projects using MCDM model R Kishore, SAM Dehmourdi, MG Naik, M Hassanpour Operational Research in Engineering Sciences: Theory and Applications 3 (3 …, 2020 | 18 | 2020 |
GIS based 4D model development for planning and scheduling of a construction project GM Naik, M Aditya, SB Naik International Journal of innovation, management and technology 2 (6), 447, 2011 | 16 | 2011 |
A kinematic wave based watershed model for soil erosion and sediment yield MG Naik, EP Rao, TI Eldho Catena 77 (3), 256-265, 2009 | 16 | 2009 |
Project cost and duration optimization using soft computing techniques GM Naik, M Kumar Journal of Advanced Management Science 1 (3), 2013 | 12 | 2013 |
Construction project cost and duration optimization using artificial neural network MG Naik, DR Kumar AEI 2015, 433-444, 2015 | 11 | 2015 |
Integrated 4D model development for planning and scheduling of a construction project using geographical information system GM Naik, M Aditya, SB Naik Proceedings of the 2nd International Conference on Construction and Project …, 2011 | 10 | 2011 |
Estimation of trap efficiency of Sriramsagar reservoir Q Sultana, MG Naik International Journal of Research in Engineering and Technology 4 (11), 116-122, 2015 | 7 | 2015 |
Sediment transport modeling and hysteresis study for pranahita sub-basin of godavari river system in india A Naresh, MM Raju, MG Naik, H Gupta, A Kumar, A Sarkar Hydro-2019, International conference on Hydraulics, Water Resources …, 2019 | 4 | 2019 |
An Investigation on Construction Crisis Framework Based on the CRITIC and WASPAS Methods, a Case Study; Khuzestan province (Iran) SAM Dehmourdi, MG Naik, R Kishore International Journal of Engineering and Advanced Technology (IJEAT) 10 (4 …, 2021 | 3 | 2021 |
Forecast of reservoir sediment trap efficiency using artificial neural networks Q Sultana, MG Naik International Journal of Research in Engineering and Technology 5 (2), 1-5, 2016 | 3 | 2016 |
A study on effect of water tanks modeled as tuned mass dampers on dynamic properties of structures DR Kumar, MG Naik, F Hoseinzadeh AEI 2015, 91-110, 2015 | 3 | 2015 |
Sustainable Construction Supply Chain Management in India, An Industry Perspective A Mudigonda, MG Naik, T Dhilip International Journal of Intelligent Systems and Applications in Engineering …, 2022 | 2 | 2022 |
A Comprehensive Review of Urban Floods and Relevant Modeling Techniques A Naresh, R Bharadwaj, MG Naik, H Gupta, MM Raju, DCS Bisht Recent Advances in Time Series Forecasting, 151-179, 2021 | 2 | 2021 |
Management of Water Supply and Sewerage System in Hyderabad GR Rao, A Naresh, MG Naik Journal of Indian Water Works Association 2, 120-125, 2019 | 2 | 2019 |
Hydrological Modeling of Musi River Basin and Impact Assessment of Land Use Change on Urban Runoff G Srinivas, GM Naik Int. J. of Eng. Res. & Tech.(IJERT) 6 (07), 1-8, 2017 | 2 | 2017 |
Estimation of Sediment Retained in Sriramsagar Reservoir Using Artificial Neural Network Technique and Conventional Method Q Sultana, MG Naik Proc. 2 nd National Conference on Water, Environment and Society (NCWES-2015 …, 2015 | 2 | 2015 |
Soil Erosion and Sediment Yield Modelling of Watershed Using FEM, Remote Sensing, and GIS MG Naik World Environmental and Water Resources Congress 2011: Bearing Knowledge for …, 2011 | 2 | 2011 |