Dynamic Bayesian network for probabilistic modeling of tunnel excavation processes O Špačková, D Straub Computer‐Aided Civil and Infrastructure Engineering 28 (1), 1-21, 2013 | 128 | 2013 |
Probabilistic assessment of tunnel construction performance based on data O Špačková, J Šejnoha, D Straub Tunnelling and Underground Space Technology 37, 62-78, 2013 | 71 | 2013 |
Cost-benefit analysis for optimization of risk protection under budget constraints O Špačková, D Straub Risk Analysis, 2015 | 64 | 2015 |
Probabilistic models for tunnel construction risk assessment O Špačková, E Novotná, M Šejnoha, J Šejnoha Advances in Engineering Software 62, 72-84, 2013 | 46 | 2013 |
Probabilistic approach to assessing and monitoring settlements caused by tunneling C Camós, O Špačková, D Straub, C Molins Tunnelling and Underground Space Technology 51, 313-325, 2016 | 45 | 2016 |
Long-term adaption decisions via fully and partially observable Markov decision processes O Špačková, D Straub Sustainable and Resilient Infrastructure, 2017 | 38 | 2017 |
Risk management of tunnel construction projects O Špačková PQDT-Global, 2012 | 36 | 2012 |
Risk quantification for tunnel excavation process J Šejnoha, D Jarušková, O Špačková, E Novotná International Journal of Mechanical Aerospace Industrial Mechatronic and …, 2009 | 28 | 2009 |
Probabilistic risk assessment of excavation performance in tunnel projects using Bayesian networks: a case study O Špačková, D Straub Proc. 3rd International Symposium on Geotechnical Safety and Risk, Munich, 2011 | 22 | 2011 |
Managing uncertainty in flood protection planning with climate projections B Dittes, O Špačková, L Schoppa, D Straub Hydrology and Earth System Sciences 22 (4), 2511-2526, 2018 | 19 | 2018 |
Risk-based optimization of adaptable protection measures against natural hazards O Špačková, B Dittes, D Straub 12th International Conference on Applications of Statistics and Probability …, 2015 | 16 | 2015 |
Probabilistic design storm method for improved flood estimation in ungauged catchments M Berk, O Špačková, D Straub Water Resources Research 53 (12), 10701-10722, 2017 | 14 | 2017 |
Risk management of tunnel construction projects: Modelling uncertainty of construction time (cost) estimates for risk assessment and decision-making O Špačková, D Straub Doctoral thesis, Czech Technical University, Prague). Czech Technical …, 2012 | 12 | 2012 |
Tunnel construction time and cost estimates: from deterministic to probabilistic approaches O Špačková, J Šejnoha, D Straub 12th int. conference Underground Construction, Prague, Czech Republic., 2013 | 10 | 2013 |
Risk-based flood protection planning under climate change and modeling uncertainty: a pre-alpine case study B Dittes, M Kaiser, O Špačková, W Rieger, M Disse, D Straub Natural Hazards and Earth System Sciences 18 (5), 1327-1347, 2018 | 9 | 2018 |
Managing uncertainty in design flood magnitude: Flexible protection strategies versus safety factors B Dittes, O Špačková, D Straub Journal of Flood Risk Management 12 (2), e12455, 2019 | 8 | 2019 |
Optimizing adaptable systems for future uncertainty D Straub, O Špačková 14th International Probabilistic Workshop, 3-13, 2017 | 7 | 2017 |
Critical infrastructure and disaster risk reduction planning under socioeconomic and climate change uncertainty O Špačková, B Dittes, D Straub IDRC Davos 2016, 579-582, 2016 | 6 | 2016 |
How to select optimal mitigation strategies for natural hazards? O Špačková, D Straub, A Rimböck 11th International Conference on Structural Safety & Reliability - ICOSSAR …, 2013 | 6 | 2013 |
Development of a probabilistic model for the prediction of building damage due to tunneling induced settlements C Camós, C Molins, O Špačková, D Straub 4th Intenational Symposium on Geotechnical Safety and Risk (ISGSR 2013 …, 2013 | 4 | 2013 |