Follow
Anis Gharbi
Anis Gharbi
Professor of Operations Research, Industrial Engineering Department, King Saud University
Verified email at ksu.edu.sa
Title
Cited by
Cited by
Year
Minimizing makespan on parallel machines subject to release dates and delivery times
A Gharbi, M Haouari
Journal of scheduling 5 (4), 329-355, 2002
952002
Optimal scheduling of a two-stage hybrid flow shop
M Haouari, L Hidri, A Gharbi
Mathematical Methods of Operations Research 64 (1), 107-124, 2006
942006
Optimal parallel machines scheduling with availability constraints
A Gharbi, M Haouari
Discrete Applied Mathematics 148 (1), 63-87, 2005
652005
Tight bounds for the identical parallel machine scheduling problem
M Haouari, A Gharbi, M Jemmali
International Transactions in Operational Research 13 (6), 529-548, 2006
532006
Scheduling IT staff at a bank: a mathematical programming approach
M Labidi, M Mrad, A Gharbi, MA Louly
The Scientific World Journal 2014, 2014
372014
An improved max-flow-based lower bound for minimizing maximum lateness on identical parallel machines
M Haouari, A Gharbi
Operations Research Letters 31 (1), 49-52, 2003
302003
The two-machine flowshop scheduling problem with sequence-independent setup times: New lower bounding strategies
A Gharbi, T Ladhari, MK Msakni, M Serairi
European Journal of Operational Research 231 (1), 69-78, 2013
282013
An approximate decomposition algorithm for scheduling on parallel machines with heads and tails
A Gharbi, M Haouari
Computers & operations research 34 (3), 868-883, 2007
272007
Energetic reasoning revisited: application to parallel machine scheduling
L Hidri, A Gharbi, M Haouari
Journal of scheduling 11, 239-252, 2008
242008
Lower bounds for scheduling on identical parallel machines with heads and tails
M Haouari, A Gharbi
Annals of Operations Research 129, 187-204, 2004
232004
Fast lifting procedures for the bin packing problem
M Haouari, A Gharbi
Discrete Optimization 2 (3), 201-218, 2005
222005
Jackson's semi-preemptive scheduling on a single machine
A Gharbi, M Labidi
Computers & Operations Research 37 (12), 2082-2088, 2010
142010
New efficient lower bound for the hybrid flow shop scheduling problem with multiprocessor tasks
L Hidri, A Gharbi
IEEE access 5, 6121-6133, 2017
122017
A computational study of the two-machine no-wait flow shop scheduling problem subject to unequal release dates and non-availability constraints
M Labidi, A Kooli, T Ladhari, A Gharbi, US Suryahatmaja
IEEE Access 6, 16294-16304, 2018
102018
Minimizing expected attacking cost in networks
A Gharbi, MN Azaiez, M Kharbeche
Electronic Notes in Discrete Mathematics 36, 947-954, 2010
102010
Bounding strategies for scheduling on identical parallel machines
M Haouari, A Gharbi, M Jemmali
2006 international conference on service systems and service management 2 …, 2006
92006
Two-stage no-wait hybrid flow shop with inter-stage flexibility for operating room scheduling
MN Azaiez, A Gharbi, I Kacem, Y Makhlouf, M Masmoudi
Computers & Industrial Engineering 168, 108040, 2022
82022
New lower bounds for flow shop scheduling
A Gharbi, A Mahjoubi
International Journal of Humanities and Management Sciences (IJHMS) 1 (125), 58, 2013
82013
Statistical modeling of emergency medical services’ response and rescue times to road traffic crashes in the Kingdom of Saudi Arabia
A Al-Zabidi, M Almannaa, M Elhenawy, A Gharbi
Case Studies on Transport Policy 10 (4), 2563-2575, 2022
72022
Physician scheduling using goal programming-an application to a large hospital in Saudi Arabia
A Gharbi, M Louly, MN Azaiez
2017 4th international conference on control, decision and information …, 2017
72017
The system can't perform the operation now. Try again later.
Articles 1–20