Sheryl Staub-French
Titel
Zitiert von
Zitiert von
Jahr
3D and 4D modeling for design and construction coordination: issues and lessons learned
S Staub-French, A Khanzode
Journal of Information Technology in Construction (ITcon) 12 (26), 381-407, 2007
2332007
Industry Foundation Classes for Project Management-A Trial Implementation.
T Froese, F Grobler, J Ritzenthaler, K Yu, B Akinci, R Akbas, B Koo, ...
ITcon 4 (Nov), 17-36, 1999
1491999
Visualizing high-rise building construction strategies using linear scheduling and 4D CAD
A Russell, S Staub-French, N Tran, W Wong
Automation in Construction 18 (2), 219-236, 2009
1132009
Developing owner information requirements for BIM-enabled project delivery and asset management
HB Cavka, S Staub-French, EA Poirier
Automation in construction 83, 169-183, 2017
972017
Embedded contexts of innovation
E Poirier, S Staub-French, D Forgues
Construction innovation, 2015
912015
A generic feature-driven activity-based cost estimation process
S Staub-French, M Fischer, J Kunz, B Paulson
Advanced Engineering Informatics 17 (1), 23-39, 2003
852003
Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research
EA Poirier, S Staub-French, D Forgues
Automation in Construction 58, 74-84, 2015
842015
Querying a building information model for construction-specific spatial information
MP Nepal, S Staub-French, R Pottinger, A Webster
Advanced Engineering Informatics 26 (4), 904-923, 2012
832012
Rethinking the cost estimating process through 5D BIM: A case study
D Forgues, I Iordanova, F Valdivesio, S Staub-French
Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012
782012
An ontology for relating features with activities to calculate costs
S Staub-French, M Fischer, J Kunz, B Paulson
Journal of Computing in Civil Engineering 17 (4), 243-254, 2003
762003
Ontology-based feature modeling for construction information extraction from a building information model
MP Nepal, S Staub-French, R Pottinger, J Zhang
Journal of Computing in Civil Engineering 27 (5), 555-569, 2013
712013
A feature ontology to support construction cost estimating
S Staub-French, M Fischer, J Kunz, K Ishii, B Paulson
Ai Edam 17 (2), 133-154, 2003
672003
Physical and digital artifact-mediated coordination in building design
M Tory, S Staub-French, BA Po, F Wu
Computer Supported Cooperative Work (CSCW) 17 (4), 311-351, 2008
622008
Industrial case study of electronic design, cost and schedule integration
S Staub-French
Stanford University, 2001
562001
Information quality assessment for facility management
PA Zadeh, G Wang, HB Cavka, S Staub-French, R Pottinger
Advanced Engineering Informatics 33, 181-205, 2017
512017
Collaboration through innovation: implications for expertise in the AEC sector
E Poirier, D Forgues, S Staub-French
Construction Management and Economics, 769-789, 2016
502016
Concurrent engineering in construction projects
C Anumba, JM Kamara, AF Cutting-Decelle
Routledge, 2006
492006
Linear scheduling and 4D visualization
S Staub-French, A Russell, N Tran
Journal of Computing in Civil Engineering 22 (3), 192-205, 2008
482008
Assessment of the impact of window size, position and orientation on building energy load using BIM
S Kim, PA Zadeh, S Staub-French, T Froese, BT Cavka
Procedia Engineering 145, 1424-1431, 2016
452016
Qualitative analysis of visualization: a building design field study
M Tory, S Staub-French
Proceedings of the 2008 Workshop on BEyond time and errors: novel evaLuation …, 2008
452008
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20