Folgen
Yujie Lu
Yujie Lu
Professor, Department of Building Engineering, College of Civil Engineering, Tongji University
Bestätigte E-Mail-Adresse bei tongji.edu.cn - Startseite
Titel
Zitiert von
Zitiert von
Jahr
Building Information Modeling (BIM) for green buildings: A critical review and future directions
Y Lu, Z Wu, R Chang, Y Li
Automation in Construction 83, 134-148, 2017
5462017
Bayesian-network-based safety risk analysis in construction projects
L Zhang, X Wu, MJ Skibniewski, J Zhong, Y Lu
Reliability Engineering & System Safety 131, 29-39, 2014
2702014
A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste
H Yuan, AR Chini, Y Lu, L Shen
Waste management 32 (3), 521-531, 2012
2432012
Understanding household waste separation behaviour: Testing the roles of moral, past experience, and perceived policy effectiveness within the theory of planned behaviour
L Xu, M Ling, Y Lu, M Shen
Sustainability 9 (4), 625, 2017
2262017
Information and communication technology applications in architecture, engineering, and construction organizations: A 15-year review
Y Lu, Y Li, M Skibniewski, Z Wu, R Wang, Y Le
Journal of Management in Engineering 31 (1), A4014010, 2015
2002015
Carbon emissions and policies in China's building and construction industry: Evidence from 1994 to 2012
Y Lu, P Cui, D Li
Building and Environment 95, 94-103, 2016
1972016
External influences on forming residents’ waste separation behaviour: Evidence from households in Hangzhou, China
L Xu, M Ling, Y Lu, M Shen
Habitat International 63, 21-33, 2017
1652017
Interaction effects of building technology and resident behavior on energy consumption in residential buildings
D Zhao, AP McCoy, J Du, P Agee, Y Lu
Energy and Buildings 134, 223-233, 2017
1582017
Sustainability attitude and performance of construction enterprises: A China study
RD Chang, J Zuo, ZY Zhao, V Soebarto, Y Lu, G Zillante, XL Gan
Journal of cleaner production 172, 1440-1451, 2018
1412018
Trust and project success: A twofold perspective between owners and contractors
W Jiang, Y Lu, Y Le
Journal of Management in Engineering 32 (6), 04016022, 2016
1402016
Bim-based risk identification system in tunnel construction
L Zhang, X Wu, L Ding, MJ Skibniewski, Y Lu
Journal of Civil Engineering and Management 22 (4), 529-539, 2016
1222016
A review and scientometric analysis of global building information modeling (BIM) research in the architecture, engineering and construction (AEC) industry
Z Liu, Y Lu, LC Peh
Buildings 9 (10), 210, 2019
1112019
Organizational behavior in megaprojects: Integrative review and directions for future research
Y Li, Y Lu, Q Cui, Y Han
Journal of management in engineering 35 (4), 04019009, 2019
1062019
Bibliographic and comparative analyses to explore emerging classic texts in megaproject management
Y Li, Y Lu, JE Taylor, Y Han
International Journal of Project Management 36 (2), 342-361, 2018
922018
The quality traceability system for prefabricated buildings using blockchain: An integrated framework
Z Zhang, Z Yuan, G Ni, H Lin, Y Lu
Frontiers of engineering management 7 (4), 528-546, 2020
892020
Energy efficient HVAC control for an IPS-enabled large space in commercial buildings through dynamic spatial occupancy distribution
W Wang, J Chen, G Huang, Y Lu
Applied Energy 207, 305-323, 2017
852017
Developing a risk assessment method for complex pipe jacking construction projects
M Cheng, Y Lu
Automation in Construction 58, 48-59, 2015
852015
Formation of interorganizational relational behavior in megaprojects: Perspective of the extended theory of planned behavior
X Zheng, Y Lu, Y Le, Y Li, J Fang
Journal of Management in Engineering 34 (1), 04017052, 2018
842018
Effectiveness and equity implications of carbon policies in the United States construction industry
Y Lu, X Zhu, Q Cui
Building and Environment 49, 259-269, 2012
812012
Which activities contribute most to building energy consumption in China? A hybrid LMDI decomposition analysis from year 2007 to 2015
Y Lu, P Cui, D Li
Energy and Buildings 165, 259-269, 2018
772018
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20