Xiangyu Wang
Title
Cited by
Cited by
Year
A theoretical framework of a BIM-based multi-disciplinary collaboration platform
V Singh, N Gu, X Wang
Automation in construction 20 (2), 134-144, 2011
5982011
A Critical Review of the Use of 3D Printing in the Construction Industry
P Wu, J Wang, X Wang
Automation in Construction 68, 21-31, 2016
4242016
Research Trend and Opportunities of Augmented Reality Applications in Architecture, Engineering and Construction
HL Chi, S Kang, X Wang
Automation in Construction 33, 116-122, 2013
3702013
A Framework for Proactive Construction Defect Management using BIM, Augmented Reality and Ontology-based Data Collection Template
C Park, D Lee, O Kwon, X Wang
Automation in Construction 33, 61-71, 2013
3082013
A Critical Review of Virtual and Augmented Reality (VR/AR) Applications in Construction Safety
X Li, W Yi, HL Chi, X Wang, APC Chan
Automation in Construction 86, 150-162, 2018
2912018
A comprehensive survey of augmented reality assembly research
X Wang, SK Ong, AYC Nee
Advances in Manufacturing 4 (1), 1-22, 2016
2612016
Augmented Reality in built environment: Classification and implications for future research
X Wang, MJ Kim, PED Love, SC Kang
Automation in construction 32, 1-13, 2013
2562013
Construction and demolition waste management in China through the 3R principle
B Huang, X Wang, H Kua, Y Geng, R Bleischwitz, J Ren
Resources, Conservation and Recycling 129, 36-44, 2018
2302018
A conceptual framework for integrating building information modeling with augmented reality
X Wang, PED Love, MJ Kim, CS Park, CP Sing, L Hou
Automation in construction 34, 37-44, 2013
2162013
A Mixed Review of the Adoption of Building Information Modelling (BIM) for Sustainability
CY Lee, H Chong, X Wang
Journal of Cleaner Production 142, 4114–4126, 2017
2032017
Engagement of facilities management in design stage through BIM: framework and a case study
Y Wang, X Wang, J Wang, P Yung, G Jun
Advances in Civil Engineering 2013, 2013
1952013
Integrating Augmented Reality with Building Information Modeling: Onsite construction process controlling for liquefied natural gas industry
X Wang, M Truijens, L Hou, Y Wang, Y Zhou
Automation in Construction 40, 96-105, 2014
1932014
A critical review of the use of virtual reality in construction engineering education and training
P Wang, P Wu, J Wang, HL Chi, X Wang
International journal of environmental research and public health 15 (6), 1204, 2018
1862018
A State-of-the-Art Review on the Integration of Building Information Modelling (BIM) and Geographic Information System (GIS)
X Liu, X Wang, G Wright, JCP Cheng, X Li, R Liu
International Journal of Geo-Information 6 (2), 53. doi:http://dx.doi.org/10 …, 2017
1732017
Determining the probability of project cost overruns
PED Love, X Wang, C Sing, RLK Tiong
Journal of Construction Engineering and Management 139 (3), 321-330, 2013
1562013
The Outlook of Blockchain Technology for Construction Engineering and Management
J Wang, P Wu, X Wang
Frontiers of Engineering Management 4, 67-75, 2017
1552017
Using animated augmented reality to cognitively guide assembly
L Hou, X Wang, L Bernold, PED Love
Journal of Computing in Civil Engineering 27 (5), 439-451, 2013
1502013
Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach
X Li, P Wu, GQ Shen, X Wang, Y Teng
Automation in Construction 84, 195-206, 2017
1372017
A comparative review of building information modelling implementation in building and infrastructure industries
W Shou, J Wang, X Wang, HY Chong
Archives of Computational Methods in Engineering 22 (2), 291-308, 2015
1272015
Using augmented reality to facilitate piping assembly: An experiment-based evaluation
L Hou, X Wang, M Truijens
Journal of Computing in Civil Engineering, CID: 05014007, 2014
1252014
The system can't perform the operation now. Try again later.
Articles 1–20