Xincong YANG
Xincong YANG
Department of Building and Real Estate, The Hong Kong Polytechnic University; School of Civil
Verified email at connect.polyu.hk - Homepage
Title
Cited by
Cited by
Year
Automatic pixel‐level crack detection and measurement using fully convolutional network
X Yang, H Li, Y Yu, X Luo, T Huang, X Yang
Computer‐Aided Civil and Infrastructure Engineering 33 (12), 1090-1109, 2018
1702018
Towards efficient and objective work sampling: Recognizing workers' activities in site surveillance videos with two-stream convolutional networks
X Luo, H Li, D Cao, Y Yu, X Yang, T Huang
Automation in Construction 94, 360-370, 2018
512018
Capturing and understanding workers’ activities in far‐field surveillance videos with deep action recognition and Bayesian nonparametric learning
X Luo, H Li, X Yang, Y Yu, D Cao
Computer‐Aided Civil and Infrastructure Engineering 34 (4), 333-351, 2019
392019
Stochastic state sequence model to predict construction site safety states through Real-Time Location Systems
H Li, X Yang, F Wang, T Rose, G Chan, S Dong
Safety science 84, 78-87, 2016
382016
Dynamics of project-based collaborative networks for BIM implementation: analysis based on stochastic actor-oriented models
D Cao, H Li, G Wang, X Luo, X Yang, D Tan
Journal of Management in Engineering 33 (3), 04016055, 2017
312017
An automatic and non-invasive physical fatigue assessment method for construction workers
Y Yu, H Li, X Yang, L Kong, X Luo, AYL Wong
Automation in construction 103, 1-12, 2019
262019
Fractal dimension in concrete and implementation for meso-simulation
X Yang, F Wang, X Yang, Q Zhou
Construction and Building Materials 143, 464-472, 2017
212017
Fractal dimension of concrete meso-structure based on X-ray computed tomography
X Yang, R Zhang, S Ma, X Yang, F Wang
Powder technology 350, 91-99, 2019
182019
Joint-level vision-based ergonomic assessment tool for construction workers
Y Yu, X Yang, H Li, X Luo, H Guo, Q Fang
Journal of construction engineering and management 145 (5), 04019025, 2019
172019
Automatic biomechanical workload estimation for construction workers by computer vision and smart insoles
Y Yu, H Li, W Umer, C Dong, X Yang, M Skitmore, AYL Wong
Journal of Computing in Civil Engineering 33 (3), 04019010, 2019
172019
Automated classification of construction site hazard zones by crowd-sourced integrated density maps
H Li, X Yang, M Skitmore, F Wang, P Forsythe
Automation in Construction 81, 328-339, 2017
152017
Computer‐Aided Optimization of Surveillance Cameras Placement on Construction Sites
X Yang, H Li, T Huang, X Zhai, F Wang, C Wang
Computer‐Aided Civil and Infrastructure Engineering, 2018
132018
Hierarchical Bayesian model of worker response to proximity warnings of construction safety hazards: Toward constant review of safety risk control measures
X Luo, H Li, F Dai, D Cao, X Yang, H Guo
Journal of Construction Engineering and Management 143 (6), 04017006, 2017
132017
Quantity and shape modification for random-fractal-based 3D concrete meso-simulation
X Yang, F Wang, X Yang, F Zhu, B Chi
Powder technology 320, 161-178, 2017
72017
Location-based measurement and visualization for interdependence network on construction sites
X Yang, X Luo, H Li, X Luo, H Guo
Advanced Engineering Informatics 34, 36-45, 2017
62017
Motion-based analysis for construction workers using biomechanical methods
Y Xincong, YU Yantao, LI Heng, LUO Xiaochun, W Fenglai
Frontiers of Engineering Management 4 (1), 84-91, 2017
62017
ESTIMATING CONSTRUCTION WORKERS'PHYSICAL WORKLOAD BY FUSING COMPUTER VISION AND SMART INSOLE TECHNOLOGIES
Y Yu, H Li, X Yang, W Umer
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2018
52018
Automated PPE-Tool pair check system for construction safety using smart IoT
X Yang, Y Yu, S Shirowzhan, H Li
Journal of Building Engineering 32, 101721, 2020
32020
A low-cost and smart IMU tool for tracking construction activities
X Yang, F Wang, X Zhai, H Li, Y Yu, X Luo
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019
22019
3D posture estimation from 2D posture data for construction workers
Y Yu, H Li, X Yang
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019
22019
The system can't perform the operation now. Try again later.
Articles 1–20