Follow
Michael Vidalis
Title
Cited by
Cited by
Year
Analysis and design of discrete part production lines
CT Papadopoulos, MEJ O'Kelly, MJ Vidalis, D Spinellis
Springer, 2009
1382009
Minimizing WIP inventory in reliable production lines
HT Papadopoulos, MI Vidalis
International Journal of Production Economics 70 (2), 185-197, 2001
812001
A heuristic algorithm for the buffer allocation in unreliable unbalanced production lines
HT Papadopoulos, MI Vidalis
Computers & Industrial Engineering 41 (3), 261-277, 2001
802001
Exact analysis of a discrete material three-station one-buffer merge system with unreliable machines
AC Diamantidis, CT Papadopoulos, MI Vidalis
International journal of production research 42 (4), 651-675, 2004
532004
On the workload and ‘phaseload’allocation problems of short reliable production lines with finite buffers
MI Vidalis, CT Papadopoulos, C Heavey
Computers & Industrial Engineering 48 (4), 825-837, 2005
332005
Optimal buffer allocation in short μ-balanced unreliable production lines
HT Papadopoulos, MI Vidalis
Computers & Industrial Engineering 37 (4), 691-710, 1999
311999
Optimal buffer storage allocation in balanced reliable production lines
HT Papadopoulos, MI Vidalis
International Transactions in Operational Research 5 (4), 325-339, 1998
281998
Markovian analysis of production lines with Coxian-2 service times
MI Vidalis, HT Papadopoulos
International Transactions in Operational Research 6 (5), 495-524, 1999
201999
A recursive algorithm for generating the transition matrices of multistation multiserver exponential reliable queueing networks
MI Vidalis, HT Papadopoulos
Computers & Operations Research 28 (9), 853-883, 2001
182001
Performance evaluation of a two‐echelon supply chain with stochastic demand, lost sales, and Coxian‐2 phase replenishment times
M Vidalis, V Vrisagotis, G Varlas
International Transactions in Operational Research 21 (4), 649-671, 2014
162014
Performance evaluation of a merge supply network: A distribution centre with multiple reliable random suppliers
MI Vidalis, G Michael
Computers & Industrial Engineering 70, 43-58, 2014
132014
Performance evaluation of a push–pull merge system with multiple suppliers, an intermediate buffer and a distribution centre with parallel machines/channels
AC Diamantidis, SI Koukoumialos, MI Vidalis
International Journal of Production Research 54 (9), 2628-2652, 2016
102016
Markovian analysis of a push-pull merge system with two suppliers, an intermediate buffer, and two retailers
A Diamantidis, S Koukoumialos, M Vidalis
International Journal of Operations Research and Information Systems (IJORIS …, 2017
92017
A heuristic algorithm for buffer allocation in unreliable production lines
GA Vouros, MI Vidalis, HT Papadopoulos
International Journal of Operations and Quantitative Management 6 (1), 23-43, 2000
92000
The buffer allocation problem
CT Papadopoulos, MJ Vidalis, MEJ O’Kelly, D Spinellis
Springer Optimization and Its Applications, 131-159, 2009
82009
Performance evaluation of a merge supply network: a production centre with multiple different reliable suppliers
MI Vidalis, S Koukoumialos, A Diamantidis, G Blanas
10th Conference on Stochastic models of manufacturing and service operations …, 2015
52015
Base-stock policies for two and three stages serial inventory systems with stochastic demand and replenishments
DD Ntio, MJ Vidalis
Operations and Supply Chain Management: An International Journal 4 (2), 78-84, 2014
42014
Performance evaluation of a merge supply system with a distribution centre, two reliable suppliers, one buffer and Erlang lead times
S Koukoumialos, D Ntio, G Varlas
International Journal of Business Science & Applied Management (IJBSAM) 7 (3 …, 2012
42012
Optimal inventory control policies of a two-stage push–pull production inventory system with lost sales under stochastic production, transportation, and external demand
G Varlas, M Vidalis, S Koukoumialos, A Diamantidis
Top 29, 799-832, 2021
32021
On the workload allocation problem of short unreliable production lines with finite buffers
MI Vidalis, C Heavey
Proc. 4th Aegean Int. Conf. Analysis of Manufacturing Systems, 1158-1162, 2003
32003
The system can't perform the operation now. Try again later.
Articles 1–20