Davide Anghinolfi
Davide Anghinolfi
Bestätigte E-Mail-Adresse bei unige.it
Titel
Zitiert von
Zitiert von
Jahr
Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops
AAG Bruzzone, D Anghinolfi, M Paolucci, F Tonelli
CIRP annals 61 (1), 459-462, 2012
2982012
A new discrete particle swarm optimization approach for the single-machine total weighted tardiness scheduling problem with sequence-dependent setup times
D Anghinolfi, M Paolucci
European Journal of Operational Research 193 (1), 73-85, 2009
1772009
Parallel machine total tardiness scheduling with a new hybrid metaheuristic approach
D Anghinolfi, M Paolucci
Computers & Operations Research 34 (11), 3471-3490, 2007
1152007
A dynamic optimization model for solid waste recycling
D Anghinolfi, M Paolucci, M Robba, AC Taramasso
Waste management 33 (2), 287-296, 2013
872013
Simulated annealing
SC Wang
Interdisciplinary Computing in Java Programming, 59-79, 2003
672003
An experimental comparison of different heuristics for the master bay plan problem
D Ambrosino, D Anghinolfi, M Paolucci, A Sciomachen
International Symposium on Experimental Algorithms, 314-325, 2010
632010
A new ant colony optimization approach for the single machine total weighted tardiness scheduling problem
D Anghinolfi, M Paolucci
International Journal of Operations Research 5 (1), 1-17, 2008
542008
A new three-step heuristic for the master bay plan problem
D Ambrosino, D Anghinolfi, M Paolucci, A Sciomachen
Maritime Economics & Logistics 11 (1), 98-120, 2009
482009
A hybrid particle swarm optimization approach for the sequential ordering problem
D Anghinolfi, R Montemanni, M Paolucci, LM Gambardella
Computers & Operations Research 38 (7), 1076-1085, 2011
422011
Freight transportation in railway networks with automated terminals: A mathematical model and MIP heuristic approaches
D Anghinolfi, M Paolucci, S Sacone, S Siri
European Journal of Operational Research 214 (3), 588-594, 2011
412011
On the problem of the automated design of large-scale robot skin
D Anghinolfi, G Cannata, F Mastrogiovanni, C Nattero, M Paolucci
IEEE Transactions on Automation Science and Engineering 10 (4), 1087-1100, 2013
282013
Facing energy-aware scheduling: a multi-objective extension of a scheduling support system for improving energy efficiency in a moulding industry
M Paolucci, D Anghinolfi, F Tonelli
Soft Computing 21 (13), 3687-3698, 2017
242017
Production planning of mixed-model assembly lines: a heuristic mixed integer programming based approach
F Tonelli, M Paolucci, D Anghinolfi, P Taticchi
Production Planning & Control 24 (1), 110-127, 2013
222013
A stochastic linear programming approach for service parts optimization
P Lonardo, D Anghinolfi, M Paolucci, F Tonelli
CIRP annals 57 (1), 441-444, 2008
212008
Performance evaluation of an adaptive ant colony optimization applied to single machine scheduling
D Anghinolfi, A Boccalatte, M Paolucci, C Vecchiola
Asia-Pacific Conference on Simulated Evolution and Learning, 411-420, 2008
192008
A matheuristic algorithm for a large-scale energy management problem
D Anghinolfi, LM Gambardella, R Montemanni, C Nattero, M Paolucci, ...
International Conference on Large-Scale Scientific Computing, 173-181, 2011
162011
A comparative analysis of solution algorithms for nonlinear freeway traffic control problems
C Pasquale, D Anghinolfi, S Sacone, S Siri, M Papageorgiou
2016 IEEE 19th International Conference on Intelligent Transportation …, 2016
152016
Psychoacoustic optimization of the spacing of propellers, helicopter rotors, and axial fans
D Anghinolfi, E Canepa, A Cattanei, M Paolucci
Journal of Propulsion and Power 32 (6), 1422-1432, 2016
132016
Heuristic approaches for the optimal wiring in large scale robotic skin design
D Anghinolfi, G Cannata, F Mastrogiovanni, C Nattero, M Paolucci
Computers & operations research 39 (11), 2715-2724, 2012
112012
A general purpose Lagrangian heuristic applied to the train loading problem
D Anghinolfi, M Paolucci
Procedia-Social and Behavioral Sciences 108, 37-46, 2014
102014
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20