Scheduling wafer lots on diffusion machines in a semiconductor wafer fabrication facility YD Kim, BJ Joo, SY Choi IEEE Transactions on Semiconductor Manufacturing 23 (2), 246-254, 2010 | 46 | 2010 |
A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints BJ Joo, YD Kim Journal of the Operational Research Society 60, 572-582, 2009 | 37 | 2009 |
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint YD Kim, BJ Joo, JH Shin Journal of Heuristics 15, 19-42, 2009 | 32 | 2009 |
Multi-level job scheduling under processing time uncertainty BJ Joo, SO Shim, TJ Chua, TX Cai Computers & Industrial Engineering 120, 480-487, 2018 | 21 | 2018 |
Dispatching rule-based algorithms for a dynamic flexible flow shop scheduling problem with time-dependent process defect rate and quality feedback BJ Joo, YC Choi, P Xirouchakis Procedia CIRP 7, 163-168, 2013 | 19 | 2013 |
Multimode resource-constrained multi-project scheduling with ad hoc activity splitting BJ Joo, PC Chua 2017 IEEE International conference on industrial engineering and engineering …, 2017 | 9 | 2017 |
Coordination-based reactive resource-constrained project scheduling BJ Joo, TJ Chua, TX Cai, PC Chua Procedia CIRP 81, 51-56, 2019 | 6 | 2019 |
A scheduling algorithm for workstations with limited waiting time constraints in a semiconductor wafer fabrication facility BJ Joo, YD Kim, JY Bang 대한산업공학회지 35 (4), 266-279, 2009 | 5 | 2009 |
A production scheduling problem with uncertain sequence-dependent set-up times and random yield BJ Joo, P Xirouchakis International Journal of Production Research 53 (9), 2820-2835, 2015 | 4 | 2015 |
An optimal solution algorithm for a batch-processing machine scheduling problem with a product-mix ratio constraint BJ Joo, YD Kim INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND …, 2007 | 1 | 2007 |
Scheduling wafer lots on diffusion machines in a semiconductor wafer fabrication facility SY Choi, BJ Joo, YD Kim International Conference on Modeling and Analysis of Semiconductor …, 2005 | 1 | 2005 |
국방분야 전력지원체계에서의 생산스케줄링 문제에 관한 연구 주병준, 안남수, 박상원, 채종목, 오병인 한국경영과학회 학술대회논문집, 559-574, 2013 | | 2013 |
Heuristics for scheduling jobs with distinct ready times on a two-stage hybrid flowhop scheduling problem with a product-mix ratio constraint BJ Joo, JH Shin, YD Kim Asia-Pacific Management Conference, 965-978, 2004 | | 2004 |
HEURISTICS FOR A TWO-STAGE HYBRID FLOWSHOP SCHEDULINGPROBLEM WITH INCOMPATIBLE JOB FAMILIES BJ Joo, YD Kim Asia Pacific Industrial Engineering and Management Systems Conference, 31.15 …, 2004 | | 2004 |
Scheduling two-machine flowshop with limited waiting time to minimize makespan BJ Joo, YD Kim International Conference on Computers and Industrial Engineering, CIE561-CIE561, 2004 | | 2004 |
조정 메쉬의 각진 모서리를 유지하기 위한 수정 Doo-Sabin 곡면 분할 알고리듬 개발 이현찬, 주병준, 홍충성 한국 CDE 학회, 2003 | | 2003 |