Åsa Fast-Berglund (Fasth)
Åsa Fast-Berglund (Fasth)
Verified email at chalmers.se
TitleCited byYear
Towards an operator 4.0 typology: a human-centric perspective on the fourth industrial revolution technologies
D Romero, J Stahre, T Wuest, O Noran, P Bernus, Å Fast-Berglund, ...
International conference on computers and industrial engineering (CIE46 …, 2016
782016
The operator 4.0: human cyber-physical systems & adaptive automation towards human-automation symbiosis work systems
D Romero, P Bernus, O Noran, J Stahre, Å Fast-Berglund
IFIP international conference on advances in production management systems …, 2016
662016
Relations between complexity, quality and cognitive automation in mixed-model assembly
Å Fast-Berglund, T Fässberg, F Hellman, A Davidsson, J Stahre
Journal of manufacturing systems 32 (3), 449-455, 2013
582013
Cognitive automation strategy for reconfigurable and sustainable assembly systems
Å Fasth-Berglund, J Stahre
Assembly automation 33 (3), 294-303, 2013
522013
Measuring and analysing Levels of Automation in an assembly system
Å Fasth, J Stahre, K Dencker
Manufacturing Systems and Technologies for the New Frontier, 169-172, 2008
422008
Towards a human-centred reference architecture for next generation balanced automation systems: human-automation symbiosis
D Romero, O Noran, J Stahre, P Bernus, Å Fast-Berglund
IFIP International Conference on Advances in Production Management Systems …, 2015
362015
Proactive assembly systems-realising the potential of human collaboration with automation
K Dencker, Å Fasth, J Stahre, L Mårtensson, T Lundholm, H Akillioglu
Annual reviews in control 33 (2), 230-237, 2009
302009
SIMTER-a joint simulation tool for production development
S Lind, B Johansson, J Stahre, C Berlin, Å Fasth, J Heilala, K Helin, ...
VTT Finland, Espoo, Working Paper 125, 2009
302009
Towards a production complexity model that supports operation, re-balancing and man-hour planning
P Gullander, A Davidsson, K Dencker, Å Fasth, T Fässberg, U Harlin, ...
Proceedings of the 4th Swedish Production Symposium (SPS): Lund, Sweden, 2011
292011
Perceived production complexity–understanding more than parts of a system
S Mattsson, M Tarrar, Å Fast-Berglund
International Journal of Production Research 54 (20), 6008-6016, 2016
262016
SIMTER: a production simulation tool for joint assessment of ergonomics, level of automation and environmental impacts
S Lind, B Krassi, B Johansson, J Viitaniemi, J Heilala, J Stahre, S Vatanen, ...
The 18th International Conference on Flexible Automation and Intelligent …, 2008
262008
Designing proactive assembly systems (ProAct)-Criteria and interaction between automation, information, and competence
Å Fasth, J Bruch, K Dencker, J Stahre, L Mårtensson, T Lundholm
Asian International Journal of Science and Technology in production and …, 2010
252010
Does Levels of Automation need to be changed in an assembly system?-A case study
Å Fasth, J Stahre
The 2nd Swedish Production Symposium (SPS), Stockholm, Sweden, 2008
232008
Evaluating cobots for final assembly
Å Fast-Berglund, F Palmkvist, P Nyqvist, S Ekered, M Åkerman
Procedia CIRP 44, 175-180, 2016
222016
Designing proactive assembly systems–Criteria and interaction between Automation, Information, and Competence
Å Fasth, T Lundholm, L Mårtensson, K Dencker, J Stahre
CIRP conference on manufacturing systems, Univ of Grenoble, France, 2009
222009
Managing production complexity by empowering workers: six cases
S Mattsson, M Karlsson, Å Fast-Berglund, I Hansson
Procedia Cirp 17, 212-217, 2014
212014
Concept model towards optimising Levels of Automation (LoA) in assembly systems
Å Fasth, J Stahre
Proceedings of the 3rd CIRP Conference on Assembly Technologies and Systems, 1-3, 2010
202010
Testing complexity index–a method for measuring perceived production complexity
S Mattsson, P Gullander, U Harlin, G Bäckstrand, Å Fasth, A Davidsson
Procedia CIRP 3, 394-399, 2012
192012
Enabling flexible manufacturing systems by using level of automation as design parameter
B Johansson, Å Fasth, J Stahre, J Heilala, S Leong, YT Lee, F Riddick
Winter Simulation Conference, 2176-2184, 2009
192009
Analysing changeability and time parameters due to levels of Automation in an assembly system
Å Fasth, J Stahre, K Dencker
Proceedings of the 18th conference on Flexible Automation and Intelligent …, 2008
192008
The system can't perform the operation now. Try again later.
Articles 1–20