Folgen
Bernard Penz
Bernard Penz
grenoble
Bestätigte E-Mail-Adresse bei grenoble-inp.fr
Titel
Zitiert von
Zitiert von
Jahr
Lot sizing with carbon emission constraints
N Absi, S Dauzère-Pérès, S Kedad-Sidhoum, B Penz, C Rapine
European Journal of Operational Research 227 (1), 55-61, 2013
3342013
Scheduling cross docking operations under full, partial and no information on inbound arrivals
R Larbi, G Alpan, P Baptiste, B Penz
Computers & Operations Research 38 (6), 889-900, 2011
1522011
An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints
C Sadfi, B Penz, C Rapine, J Błażewicz, P Formanowicz
European journal of operational research 161 (1), 3-10, 2005
1372005
A bounded dynamic programming approach to schedule operations in a cross docking platform
G Alpan, R Larbi, B Penz
Computers & Industrial Engineering 60 (3), 385-396, 2011
1152011
Mutual impacts of product standardization and supply chain design
B Baud-Lavigne, B Agard, B Penz
International Journal of Production Economics 135 (1), 50-60, 2012
1102012
The single-item green lot-sizing problem with fixed carbon emissions
N Absi, S Dauzère-Pérès, S Kedad-Sidhoum, B Penz, C Rapine
European Journal of Operational Research 248 (3), 849-855, 2016
1032016
Reconciling sales and operations management with distant suppliers in the automotive industry: A simulation approach
LL Lim, G Alpan, B Penz
International Journal of Production Economics 151, 20-36, 2014
882014
Heuristic solutions for transshipment problems in a multiple door cross docking warehouse
G Alpan, AL Ladier, R Larbi, B Penz
Computers & Industrial Engineering 61 (2), 402-408, 2011
862011
A simulated annealing method based on a clustering approach to determine bills of materials for a large product family
B Agard, B Penz
International Journal of Production Economics 117 (2), 389-401, 2009
742009
Environmental constraints in joint product and supply chain design optimization
B Baud-Lavigne, B Agard, B Penz
Computers & Industrial Engineering 76, 16-22, 2014
722014
Sensitivity analysis of scheduling algorithms
B Penz, C Rapine, D Trystram
European Journal of Operational Research 134 (3), 606-615, 2001
592001
Minimizing the makespan in the two-machine no-wait flow-shop with limited machine availability
ML Espinouse, P Formanowicz, B Penz
Computers & Industrial Engineering 37 (1-2), 497-500, 1999
581999
A simulation-optimization approach for sales and operations planning in build-to-order industries with distant sourcing: Focus on the automotive industry
LL Lim, G Alpan, B Penz
Computers & Industrial Engineering 112, 469-482, 2017
572017
Techno‐economic planning of local energy systems through optimization models: a survey of current methods
E Cuisinier, C Bourasseau, A Ruby, P Lemaire, B Penz
International Journal of Energy Research 45 (4), 4888-4931, 2021
542021
Collaboration for a two-echelon supply chain in the pulp and paper industry: the use of incentives to increase profit
N Lehoux, S d'Amours, Y Frein, A Langevin, B Penz
Journal of the Operational Research Society 62 (4), 581-592, 2011
512011
Simultaneous design of a product family and its related supply chain using a Tabu Search algorithm
REH Khalaf, B Agard, B Penz
International Journal of Production Research 49 (19), 5637-5656, 2011
452011
An experimental study for the selection of modules and facilities in a mass customization context
REH Khalaf, B Agard, B Penz
Journal of Intelligent Manufacturing 21, 703-716, 2010
442010
Joint employee weekly timetabling and daily rostering: A decision-support tool for a logistics platform
AL Ladier, G Alpan, B Penz
European Journal of Operational Research 234 (1), 278-291, 2014
432014
Simultaneous product family and supply chain design: An optimization approach
B Baud-Lavigne, B Agard, B Penz
International Journal of production economics 174, 111-118, 2016
412016
Analysis of an improved branch-and-cut formulation for the inventory-routing problem with transshipment
W Lefever, EH Aghezzaf, K Hadj-Hamou, B Penz
Computers & Operations Research 98, 137-148, 2018
392018
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20