Do right PLS and do PLS right: A critical review of the application of PLS-SEM in construction management research N Zeng, Y Liu, P Gong, M Hertogh, M König Frontiers of Engineering Management 8, 356-369, 2021 | 98 | 2021 |
基于 BIM 的智慧工地管理体系框架研究 曾凝霜, 刘琰, 徐波 施工技术, 96-100, 2015 | 34 | 2015 |
Relationship between the dynamics of social capital and the dynamics of residential satisfaction under the impact of urban renewal T Du, N Zeng, Y Huang, H Vejre Cities 107, 102933, 2020 | 31 | 2020 |
An empirical study on the acceptance of 4D BIM in EPC projects in China P Gong, N Zeng, K Ye, M König Sustainability 11 (5), 1316, 2019 | 31 | 2019 |
Investigating the relationship between construction supply chain integration and sustainable use of material: Evidence from China N Zeng, Y Liu, C Mao, M König Sustainability 10 (10), 3581, 2018 | 21 | 2018 |
Development path of construction industry internet platform: An AHP–TOPSIS integrated approach K Li, T Duan, Z Li, X Xiahou, N Zeng, Q Li Buildings 12 (4), 441, 2022 | 14 | 2022 |
Systematic literature review on smart contracts in the construction industry: Potentials, benefits, and challenges X Ye, N Zeng, M König Frontiers of engineering management 9 (2), 196-213, 2022 | 13 | 2022 |
A scenario-based simulation framework of on-and off-site construction logistics N Zeng, M Dichtl, M König 2017 Winter Simulation Conference (WSC), 2348-2359, 2017 | 9 | 2017 |
Applying Kanban System in Construction Logistics for Real-time Material Demand Report and Pulled Replenishment N Zeng, X Ye, X Peng, M König Proceedings of the 36th International Symposium on Automation and Robotics …, 2019 | 7 | 2019 |
Off-site guarding: look-ahead supply scheduling for risk indication with BIM N Zeng, M König, J Teizer ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION 25, 2017 | 6 | 2017 |
On-site construction management framework based on a real-time building information modeling system N Zeng, Y Liu, X Li, B Xu eWork and eBusiness in Architecture, Engineering and Construction: ECPPM …, 2014 | 6 | 2014 |
Visualization of blockchain-based smart contracts for delivery, acceptance, and payment process using BIM X Ye, N Zeng, M König IOP Conference Series: Earth and Environmental Science 1101 (4), 042013, 2022 | 4 | 2022 |
Research on the concept and framework of building information modeling ecosystem Y Liu, N Zeng, B Xu 2014 International Conference on Management Science & Engineering 21th …, 2014 | 4 | 2014 |
On-site construction management framework based on a real-time building information modeling system. eWork and eBusiness in Architecture YL Ningshuang Zeng, X Li, B Xu Engineering and Construction: ECPPM 2014, 95, 2014 | 2 | 2014 |
The effects of project uncertainty on guanxi governance and contractual governance YH Lin, D Niu, Y Guo, N Zeng Engineering, Construction and Architectural Management, 2023 | 1 | 2023 |
4D BIM-Enabled Look-Ahead Scheduling for Early Warning of Off-Site Supply Chain Disruptions N Zeng, Y Liu, M König Journal of Construction Engineering and Management 149 (1), 04022154, 2023 | 1 | 2023 |
Development Path of Construction Industry Internet Platform: An AHP–TOPSIS Integrated Approach. Buildings 2022, 12, 441 K Li, T Duan, Z Li, X Xiahou, N Zeng, Q Li s Note: MDPI stays neutral with regard to jurisdictional claims in published …, 2022 | 1 | 2022 |
Applying object-oriented analysis and design to digital construction logistics planning from a material flow perspective N Zeng, M König, C Mao ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2018 | 1 | 2018 |
Supply Chain Modeling for BIM-oriented Construction Schedule Management: CODP-based Classification Approach N Zeng, M König, Y Liu, B Xu Proc. of the 32nd CIB W78 Conference, 2015 | 1 | 2015 |
Check for updates Smart Contract-Enabled Construction Claim Management in BIM and CDE-Enhanced Data Environment X Yel, N Zeng, Y Liu, M König¹ Construction Logistics, Equipment, and Robotics: Proceedings of the CLEaR …, 2023 | | 2023 |