Folgen
Jaakko Peltokorpi
Jaakko Peltokorpi
Aalto University, Department of Mechanical Engineering
Bestätigte E-Mail-Adresse bei aalto.fi
Titel
Zitiert von
Zitiert von
Jahr
Effects of group size and learning on manual assembly performance: an experimental study
J Peltokorpi, E Niemi
International Journal of Production Research 57 (2), 452-469, 2019
242019
Adjustment for cognitive interference enhances the predictability of the power learning curve
MY Jaber, J Peltokorpi, CH Glock, EH Grosse, M Pusic
International Journal of Production Economics 234, 108045, 2021
212021
A group learning curve model with motor, cognitive and waste elements
J Peltokorpi, MY Jaber
Computers & Industrial Engineering 146, 106621, 2020
152020
Interference-adjusted power learning curve model with forgetting
J Peltokorpi, MY Jaber
International Journal of Industrial Ergonomics 88, 103257, 2022
102022
Graph-based analysis of metal cutting parameters
S Laakso, J Peltokorpi, J Ratava, M Lohtander, J Varis
Advances in Sustainable and Competitive Manufacturing Systems: 23rd …, 2013
102013
The lot size problem and the learning curve: A review of mathematical modeling (1950’s-2020)
MY Jaber, J Peltokorpi, TL Smunt
Applied Mathematical Modelling 105, 832-859, 2022
92022
Analysis of the effects of group size and learning on manual assembly performance
J Peltokorpi, E Niemi
Procedia Manufacturing 39, 964-973, 2019
92019
QR code-based material flow monitoring in a subcontractor manufacturer network
J Peltokorpi, L Isojärvi, K Häkkinen, E Niemi
Procedia Manufacturing 55, 110-115, 2021
82021
Worker coordination policies in parallel station systems: performance models for a set of jobs and for continuous arrival of jobs
J Peltokorpi, H Tokola, E Niemi
International Journal of Production Research 53 (6), 1625-1641, 2015
82015
An interference-adjusted power learning curve for tasks with cognitive and motor elements
J Peltokorpi, MY Jaber
Applied Mathematical Modelling 101, 157-170, 2022
72022
The effects of learning in production and group size on the lot-sizing problem
MY Jaber, J Peltokorpi
Applied Mathematical Modelling 81, 419-427, 2020
72020
Differences between worker pairs in manual assembly: a case study
J Peltokorpi, E Niemi
Procedia Manufacturing 25, 535-542, 2018
62018
Manual assembly learning, disability, and instructions: an industrial experiment
J Peltokorpi, S Hoedt, T Colman, K Rutten, EH Aghezzaf, J Cottyn
International Journal of Production Research 61 (22), 7903-7921, 2023
42023
Effective relationships of factors in a manual assembly line environment
J Peltokorpi, M Lohtander, SVA Laakso
International Journal of Engineering Management and Economics 4 (3-4), 267-290, 2014
32014
Comparison of balancing policies in multi-item assembly
J Peltokorpi, H Tokola, E Niemi
International Conference on Flexible Automation and Intelligent …, 2012
32012
Relationships of factors in a manual assembly line environment
J Peltokorpi, S Laakso, J Ratava, M Lohtander, J Varis
Advances in Sustainable and Competitive Manufacturing Systems: 23rd …, 2013
22013
Potential Models of Group Learning in Production
J Peltokorpi, MY Jaber
SPS2020, 205-216, 2020
12020
Worker Coordination, Collaboration and Learning in Make-to-order Assembly Production
J Peltokorpi
Aalto University, 2018
12018
Comparing worker coordination policies in parallel station systems with different worker skill level distributions
J Peltokorpi, E Niemi, H Tokola
25th International Conference on Flexible Automation & Intelligent …, 2015
12015
Economic order/production quantity (EOQ/EPQ) models with product recovery: A review of mathematical modeling (1967–2022)
MY Jaber, J Peltokorpi
Applied Mathematical Modelling 129, 655-672, 2024
2024
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20