Follow
Carlos Enrique Arroyo Ortiz
Carlos Enrique Arroyo Ortiz
Professor Escola de Minas - UFOP
Verified email at ufop.edu.br - Homepage
Title
Cited by
Cited by
Year
Rare earth elements in the international economic scenario
CEA Ortiz, EM Viana Júnior
Rem: Revista Escola de Minas 67, 361-366, 2014
172014
Direct block scheduling technology: Analysis of Avidity
FR Souza, HR Burgarelli, AS Nader, CEA Ortiz, LS Chaves, LA Carvalho, ...
REM-International Engineering Journal 71, 97-104, 2018
142018
Application of optimized models through direct block scheduling in traditional mine planning
PHA Campos, CE Arroyo, N Morales
Journal of the Southern African Institute of Mining and Metallurgy 118 (4 …, 2018
112018
Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project
PHA Campos, IE Cabral, CEA Ortiz, N Morales
REM-International Engineering Journal 71, 269-274, 2018
112018
Direct block scheduling under marketing uncertainties
HR Burgarelli, FR Souza, AS Nader, VFN Torres, TR Câmara, CEA Ortiz, ...
REM-International Engineering Journal 71, 275-280, 2018
92018
Direct stockpile scheduling: Mathematical formulation
F Souza, LS Chaves, H Burgarelli, A Nader, C Arroyo, L Alberto
Dyna 85 (204), 296-301, 2018
82018
Truck-and-loader versus conveyor belt system: an environmental and economic comparison
CM De Almeida, T de Castro Neves, C Arroyo, P Campos
Proceedings of the 27th International Symposium on Mine Planning and …, 2019
62019
Dimensionamiento de flota en las operaciones de carguío y transporte usando modelos de simulación de sistemas
OL de Noronha, AEC Nuñez, AF Dos Reis, CEA Ortiz
Interfases, 43-55, 2018
62018
Tratamiento de la gingivoestomatitis herpetica-estudio doble ciego entre ribavirin y placebo
S Esper-Dib, I Scholz, C Arroyo
Sem Med 92, 245-250, 1977
61977
Analysis of the impacts of slope angle variation on slope stability and NPV via two different final pit definition techniques
LS Chaves, LA Carvalho, FR Souza, B Nader, CEA Ortiz, VFN Torres, ...
REM-International Engineering Journal 73, 119-126, 2019
52019
Classical and stochastic mine planning techniques, state of the art and trends
VFN Torres, B Nader, CEA Ortiz, FR Souza, HR Burgarelli, LS Chaves, ...
REM-International Engineering Journal 71, 289-297, 2018
52018
The use of simulation in fleet selection and equipment sizing in mining
CEA Ortiz, A Curi, PH Campos
Mine Planning and Equipment Selection: Proceedings of the 22nd MPES …, 2014
52014
Impact of bulk density estimation in mine planning
C Reis, C Arroyo, A Curi, M Zangrandi
Mining Technology 130 (1), 60-65, 2021
42021
Environmental and operational benefits through implementing a fleet management system in mining industry.
WS Felsch Junior, CE Arroyo Ortiz, A Curi, DR Gonçalves, AA Pinto
42020
Beneficios de la implementación de un sistema de telemetría para la gestión de las operaciones mineras
WSF Junior, CEA Ortiz, V de Souza Oliveira, PRV Da Cunha, ÉFDA Costa
Interfases, 87-102, 2018
42018
Green hydrogen: Decarbonization in mining-review
RL Figueiredo, JM da Silva, CEA Ortiz
Cleaner Energy Systems, 100075, 2023
32023
Geostatistical analyses applied to estimating geotechnical parameters–study case: Córrego do Sítio Mine
YC Vilca, CEA Ortiz, MS Lana, FC Pereira, RLP Canabrava, SS Chaves, ...
ISRM Congress, ISRM-14CONGRESS-2019-356, 2019
32019
The use of simulation in fleet selection and equipment sizing in mining
CE Arroyo Ortiz, A Curi, PH Campos
Dresden. Singhal, R. and Drebensted, C.(eds.): 22th Mine planning and …, 2013
32013
Non-deterministic load and dump behaviour in mining haul trucks: a case of study
RC Barbosa, CEA Ortiz, A Curi
Mining Technology 130 (3), 188-194, 2021
22021
Caracterização geometalúrgica e modelagem geoestatística da Mina de Brucutu–Quadrilátero Ferrífero (MG).
CE Arroyo Ortiz
22014
The system can't perform the operation now. Try again later.
Articles 1–20