Preliminary design of the HEBT of IFMIF DONES O Nomen, D Sanchez-Herranz, C Oliver, I Podadera, R Varela, F Ogando, ... Fusion Engineering and Design 153, 111515, 2020 | 21 | 2020 |
The accelerator system of IFMIF-DONES multi-MW facility I Podadera, A Ibarra, D Jiménez-Rey, J Molla, C de la Morena, C Oliver, ... Proc. IPAC’21, 1910-1913, 2021 | 14 | 2021 |
Design of the HEBT components inside TIR room of the IFMIF DONES facility D Sánchez-Herranz, O Nomen, F Arranz, S Coloma, I Podadera, R Varela Fusion Engineering and Design 168, 112636, 2021 | 8 | 2021 |
Beam diagnostics for the multi-MW high energy beam transport line of DONES I Podadera, A Ibarra, D Jiménez-Rey, J Mollá, C Oliver, R Varela, ... Proc. 8th Int. Beam Instrumentation Conf.(IBIC’19), 200-204, 2019 | 8 | 2019 |
Logistics and maintenance research activities for DONES facility F Arranz, T Lehmann, F Rauscher, G Fischer, S Koehler, J Garrido, ... Fusion Engineering and Design 192, 113630, 2023 | 7 | 2023 |
Remote handling in the accelerator systems of DONES F Arranz, G Micciche, S Coloma, D Sánchez-Herranz, O Nomen, M Ferre, ... IEEE Transactions on Plasma Science 48 (6), 1743-1747, 2020 | 7 | 2020 |
Impact of the Magnet Alignment and Field Errors on the Output Uniform Beam at the DONES HEBT line C Oliver, A Ibarra, J Molla, I Podadera, R Varela, H Dzitko, O Nomen, ... Proc. IPAC’21, 3251-3253, 2021 | 6 | 2021 |
Status of the engineering design of the IFMIF-DONES high energy beam transport line and beam dump system D Sánchez-Herranz, O Nomen, M Sanmartí, BK Singh, F Arranz, ... Journal of Physics: Conference Series 2420 (1), 012080, 2023 | 5 | 2023 |
Commissioning plan of the IFMIFDONES accelerator I Podadera, A Ibarra, M Weber, B Bolzon, N Chauvin, S Chel, A Madur, ... Proc. LINAC’22, 330-333, 2022 | 5 | 2022 |
Design and configurations for the Shielding of the Beam Dump of IFMIF DONES D Sanchez-Herranz, P Ortego, O Nomen, B Branas, F Ogando, P Sauvan, ... Fusion Engineering and Design 153, 111475, 2020 | 4 | 2020 |
Overview of IFMIF-DONES diagnostics: Requirements and techniques C Torregrosa-Martin, A Ibarra, J Aguilar, F Ambi, F Arranz, F Arbeiter, ... Fusion engineering and design 191, 113556, 2023 | 3 | 2023 |
Remote handling maintenance of beam dump in IFMIF-DONES S Coloma, M Ferre, F Arranz, G Miccichè, D Sánchez-Herranz, O Nomen, ... Fusion Engineering and Design 165, 112216, 2021 | 2 | 2021 |
Beam-facing material selection for mitigation of residual doses in the HEBT of IFMIF-DONES F Ogando, L Macia, V Lopez, I Podadera, D Sanchez-Herranz Nuclear Materials and Energy 38, 101592, 2024 | 1 | 2024 |
Configuration and Engineering Integration in the IFMIF-DONES Project D Sánchez-Herranz, J Aguilar, A Moreno, W Krolas IPAC, 0 | 1 | |
Engineering design status of IFMIF-DONES High Energy Beam Transport line and Beam Dump system inside the TIR and RIZ L Macià, O Nomen, M Sanmartí, D Sánchez-Herranz, C Torregrosa-Martin, ... Fusion Engineering and Design 202, 114312, 2024 | | 2024 |
Alignment strategy for IFMIF-DONES facility F Arranz, S Becerril, D Bernardi, T Dezsi, J Gutierrez, M Garcia, J Maestre, ... Fusion Engineering and Design 200, 114181, 2024 | | 2024 |
Pee Power Urinal–Microbial Fuel Cell Technology Field Trials In The Context Of Sanitation 2 GP Merino-Jimenez, D Sanchez-Herranz, J Greenman | | |