Folgen
Samuel Deleplanque
Samuel Deleplanque
JUNIA - ISEN - IEMN
Bestätigte E-Mail-Adresse bei junia.com - Startseite
Titel
Zitiert von
Zitiert von
Jahr
Transfers in the on-demand transportation: the DARPT Dial-a-Ride Problem with transfers allowed
S Deleplanque, A Quilliot
Multidisciplinary international scheduling conference: theory and …, 2013
202013
A branch-price-and-cut procedure for the discrete ordered median problem
S Deleplanque, M Labbé, D Ponce, J Puerto
INFORMS Journal on Computing 32 (3), 582-599, 2020
182020
Dial-a-ride problem with time windows, transshipments, and dynamic transfer points
S Deleplanque, A Quilliot
IFAC Proceedings Volumes 46 (9), 1256-1261, 2013
172013
Lagrangean heuristic for a multi-plant lot-sizing problem with transfer and storage capacities
S Deleplanque, S Kedad-Sidhoum, A Quilliot
RAIRO-Operations Research 47 (4), 429-443, 2013
132013
Integrating yards, network and optimisation models towards real-time rail freight yard operations| Integrazione di impianti merci, rete e modelli di ottimizzazione per l …
R Licciardello, N Adamko, S Deleplanque, P Hosteins, R Liu, P Pellegrini, ...
Ingegneria Ferroviaria 75 (6), 417-447, 2020
122020
Constraint propagation for the dial-a-ride problem with split loads
S Deleplanque, A Quilliot
Recent Advances in Computational Optimization, 31-50, 2013
82013
Train management in freight shunting yards: Formalisation and literature review
S Deleplanque, P Hosteins, P Pellegrini, J Rodriguez
IET Intelligent Transport Systems 16 (10), 1286-1305, 2022
72022
Insertion techniques and constraint propagation for the DARP
S Deleplanque, A Quilliot
FedCSIS, 393 - 400, 2012
62012
Routing on dynamic networks: GRASP versus genetic
B Bernay, S Deleplanque, A Quilliot
2014 Federated Conference on Computer Science and Information Systems, 487-492, 2014
52014
Décomposition d'un Problème de Lot-Sizing Multi-site en Problèmes de Localisation et de Multi-flots
S Deleplanque, C Duhamel, S Kedad-Sidhoum, H Liberalino, A Quilliot
ROADEF 2012-13ème Congrès de la Société Française de Recherche …, 2012
42012
Contrôle du tangage d'un véhicule en phase balistique
P VASLIN, V POUZOLS, C GOUINAUD, JC FAUROUX, ...
20ème Congrès Français de Mécanique, 28 août/2 sept. 2011-25044 Besançon …, 2011
42011
Maintenance on the Railway Network: Disruptions and re-scheduling
S Deleplanque
Electronic Notes in Discrete Mathematics 69, 109-116, 2018
32018
Robustness tools in dynamic dial-a-ride problems
S Deleplanque, A Quilliot
Recent Advances in Computational Optimization: Results of the Workshop on …, 2015
32015
Anticipation in the Dial-a-Ride Problem: an introduction to the robustness
S Deleplanque, JP Derutin, A Quilliot
2013 Federated Conference on Computer Science and Information Systems, 299-305, 2013
32013
Decomposing a Multi-Plant, Multi-Item Lot-Sizing Problem with Transfer Costs/Capacities into Facility Location and Flow Sub-Problems
S DELEPLANQUE, A QUILLIOT, S KEDAD-SIDHOUM
IFAC Proceedings Volumes 45 (6), 1433-1438, 2012
32012
Insertion et propagation de contraintes pour le DARP
S Deleplanque, A Quilliot, H Toussaint
ROADEF 2012, 2012
32012
A Quantum Annealing Solution to the Job Shop Scheduling Problem
R Aggoune, S Deleplanque
International Conference on Computational Science and Its Applications, 421-428, 2023
22023
An extended version of a branch-price-and-cut procedure for the discrete ordered median problem
S Deleplanque, M Labbé, D Ponce, J Puerto
arXiv preprint arXiv:1802.03191, 2018
22018
Branch and price for a reliability oriented darp model
S Deleplanque, A Quilliot, B Bernay
2014 International Conference on Control, Decision and Information …, 2014
22014
Modélisation et résolution de problèmes difficiles de transport à la demande et de Lot-Sizing
S Deleplanque
Université Blaise Pascal-Clermont-Ferrand II, 2014
22014
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20