Follow
Ghasem Moslehi
Ghasem Moslehi
Professor of Industrial Engineering, Isfahan University of Technology (IUT)
Verified email at cc.iut.ac.ir - Homepage
Title
Cited by
Cited by
Year
A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search
G Moslehi, M Mahnam
International Journal of Production Economics 129 (1), 14-22, 2011
4442011
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
G Moslehi, M Mirzaee, M Vasei, M Modarres, A Azaron
International Journal of Production Economics 122 (2), 763-773, 2009
652009
Two-sided assembly line balancing considering the relationships between tasks
D Khorasanian, SR Hejazi, G Moslehi
Computers & Industrial Engineering 66 (4), 1096-1105, 2013
582013
Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert
R Tavakkoli-Moghaddam, G Moslehi, M Vasei, A Azaron
Applied Mathematics and Computation 167 (2), 1430-1450, 2005
562005
Optimizing blocking flow shop scheduling problem with total completion time criterion
G Moslehi, D Khorasanian
Computers & Operations Research 40 (7), 1874-1883, 2013
532013
Energy-efficient scheduling in an unrelated parallel-machine environment under time-of-use electricity tariffs
H Saberi-Aliabad, M Reisi-Nafchi, G Moslehi
Journal of Cleaner Production 249, 119393, 2020
492020
A hybrid variable neighborhood search algorithm for solving the limited-buffer permutation flow shop scheduling problem with the makespan criterion
G Moslehi, D Khorasanian
Computers & Operations Research 52, 260-268, 2014
482014
A hybrid genetic and linear programming algorithm for two-agent order acceptance and scheduling problem
M Reisi-Nafchi, G Moslehi
Applied Soft Computing 33, 37-47, 2015
412015
A Benders decomposition approach for order acceptance and scheduling problem: a robust optimization approach
S Emami, G Moslehi, M Sabbagh
Computational and applied mathematics 36, 1471-1515, 2017
382017
Minimizing the number of tardy jobs under piecewise-linear deterioration
G Moslehi, A Jafari
Computers & Industrial Engineering 59 (4), 573-584, 2010
362010
A Lagrangian relaxation algorithm for order acceptance and scheduling problem: a globalised robust optimisation approach
S Emami, M Sabbagh, G Moslehi
International Journal of Computer Integrated Manufacturing 29 (5), 535-560, 2016
322016
Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness
M Mahnam, G Moslehi, SMTF Ghomi
Mathematical and Computer Modelling 57 (9-10), 2549-2563, 2013
322013
A branch-and-bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert
R Tavakkoli-Moghaddam, G Moslehi, M Vasei, A Azaron
Applied Mathematics and Computation 174 (1), 388-408, 2006
322006
A branch-and-bound algorithm to minimise the sum of maximum earliness and tardiness in the single machine
G Moslehi, M Mahnam, M Amin-Nayeri, A Azaron
International Journal of Operational Research 8 (4), 458-482, 2010
302010
The re-planning and scheduling of surgical cases in the operating room department after block release time with resource rescheduling
B Akbarzadeh, G Moslehi, M Reisi-Nafchi, B Maenhout
European Journal of Operational Research 278 (2), 596-614, 2019
292019
Robust scheduling of parallel machines considering total flow time
S Alimoradi, M Hematian, G Moslehi
Computers & industrial engineering 93, 152-161, 2016
292016
Scheduling linear deteriorating jobs to minimize the number of tardy jobs
A Jafari, G Moslehi
Journal of Global Optimization 54, 389-404, 2012
282012
Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem
E Molaee, G Moslehi, M Reisi
Computers & Mathematics with Applications 60 (11), 2909-2919, 2010
282010
A branch-and-bound algorithm for minimizing the sum of maximum earliness and tardiness with unequal release times
M Mahnam, G Moslehi
Engineering Optimization 41 (6), 521-536, 2009
282009
A branch-and-bound algorithm for single machine scheduling with quadratic earliness and tardiness penalties
K Kianfar, G Moslehi
Computers & operations research 39 (12), 2978-2990, 2012
262012
The system can't perform the operation now. Try again later.
Articles 1–20