Folgen
Sinan Gürel
Titel
Zitiert von
Zitiert von
Jahr
A strong conic quadratic reformulation for machine-job assignment with controllable processing times
MS Aktürk, A Atamtürk, S Gürel
Operations Research Letters 37 (3), 187-191, 2009
1742009
Aircraft rescheduling with cruise speed control
MS Aktürk, A Atamtürk, S Gürel
Operations Research 62 (4), 829-845, 2014
1062014
An integrated approach for airline scheduling, aircraft fleeting and routing with cruise speed control
H Gürkan, S Gürel, MS Aktürk
Transportation Research Part C: Emerging Technologies 68, 38-57, 2016
732016
Integrated aircraft and passenger recovery with cruise time controllability
U Arıkan, S Gürel, MS Aktürk
Annals of Operations Research 236, 295-317, 2016
672016
Flight network-based approach for integrated airline recovery with cruise speed control
U Arıkan, S Gürel, MS Aktürk
Transportation Science 51 (4), 1259-1287, 2017
562017
An anticipative scheduling approach with controllable processing times
S Gürel, E Körpeoğlu, MS Aktürk
Computers & Operations Research 37 (6), 1002-1013, 2010
542010
Energy conscious scheduling of a material handling robot in a manufacturing cell
S Gürel, H Gultekin, VE Akhlaghi
Robotics and computer-integrated manufacturing 58, 97-108, 2019
512019
Parallel machine match-up scheduling with manufacturing cost considerations
MS Aktürk, A Atamtürk, S Gürel
Journal of Scheduling 13, 95-110, 2010
512010
Robust airline scheduling with controllable cruise times and chance constraints
AS Duran, S Gürel, MS Aktürk
IIE Transactions 47 (1), 64-83, 2015
382015
Integrated aircraft-path assignment and robust schedule design with cruise speed control
Ö Şafak, S Gürel, MS Aktürk
Computers & Operations Research 84, 127-145, 2017
332017
The congested multicommodity network design problem
DC Paraskevopoulos, S Gürel, T Bektaş
Transportation Research Part E: Logistics and Transportation Review 85, 166-187, 2016
272016
Impact assessment based sectoral balancing in public R&D project portfolio selection
M Çağlar, S Gürel
Socio-Economic Planning Sciences 66, 68-81, 2019
232019
Efficiency analysis of load balancing games with and without activation costs
B Chen, S Gürel
Journal of Scheduling 15, 157-164, 2012
222012
A heterogeneous fleet liner ship scheduling problem with port time uncertainty
S Gürel, A Shadmand
Central European Journal of Operations Research 27, 1153-1175, 2019
212019
Bicriteria scheduling of a material handling robot in an m-machine cell to minimize the energy consumption of the robot and the cycle time
H Gultekin, S Gürel, R Taspinar
Robotics and Computer-Integrated Manufacturing 72, 102207, 2021
192021
Public R&D project portfolio selection problem with cancellations
M Çağlar, S Gürel
OR Spectrum 39 (3), 659-687, 2017
192017
Rescheduling with controllable processing times for number of disrupted jobs and manufacturing cost objectives
S Gürel, D Cincioğlu
International Journal of Production Research 53 (9), 2751-2770, 2015
192015
Using cost change estimates in a local search heuristic for the pollution routing problem
OC Saka, S Gürel, TV Woensel
OR spectrum 39, 557-587, 2017
162017
A conic quadratic formulation for a class of convex congestion functions in network flow problems
S Gürel
European Journal of Operational Research 211 (2), 252-262, 2011
152011
Scheduling a dual gripper material handling robot with energy considerations
S Gürel, H Gultekin, N Emiroglu
Journal of Manufacturing Systems 67, 265-280, 2023
62023
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20