Folgen
Hosein Taghaddos
Hosein Taghaddos
Associate Professor, School of Civil Engineering, College of Engineering, University of Tehran
Bestätigte E-Mail-Adresse bei ut.ac.ir - Startseite
Titel
Zitiert von
Zitiert von
Jahr
Prediction of long-term chloride diffusion in silica fume concrete in a marine environment
A Farahani, H Taghaddos, M Shekarchi
Cement and Concrete Composites 59, 10-17, 2015
1932015
Simulation-based multiagent approach for scheduling modular construction
H Taghaddos, U Hermann, S AbouRizk, Y Mohamed
Journal of Computing in Civil Engineering 28 (2), 263-274, 2014
1122014
A methodology for mobile crane lift path checking in heavy industrial projects
Z Lei, H Taghaddos, U Hermann, M Al-Hussein
Automation in Construction 31, 41-53, 2013
1002013
Automated crane planning and optimization for modular construction
H Taghaddos, U Hermann, AB Abbasi
Automation in construction 95, 219-232, 2018
812018
Automated method for checking crane paths for heavy lifts in industrial projects
Z Lei, H Taghaddos, J Olearczyk, M Al-Hussein, U Hermann
Journal of construction engineering and management 139 (10), 04013011, 2013
622013
BIM-based 4D mobile crane simulation and onsite operation management
AN Tak, H Taghaddos, A Mousaei, A Bolourani, U Hermann
Automation in Construction 128, 103766, 2021
552021
Algorithm for mobile crane walking path planning in congested industrial plants
Z Lei, SH Han, A Bouferguène, H Taghaddos, U Hermann, M Al-Hussein
Journal of Construction Engineering and Management 141 (2), 05014016, 2015
492015
Simulation-based auction protocol for resource scheduling problems
H Taghaddos, S AbouRizk, Y Mohamed, U Hermann
Journal of construction engineering and management 138 (1), 31-42, 2012
442012
Utilization of semantic web technologies to improve BIM-LCA applications
S Sobhkhiz, H Taghaddos, M Rezvani, AM Ramezanianpour
Automation in Construction 130, 103842, 2021
432021
Heavy mobile crane lift path planning in congested modular industrial plants using a robotics approach
N Kayhani, H Taghaddos, A Mousaei, S Behzadipour, U Hermann
Automation in Construction 122, 103508, 2021
422021
Evaluating mobile crane lift operations using an interactive virtual reality system
S Pooladvand, H Taghaddos, A Eslami, A Nekouvaght Tak, U Hermann
Journal of Construction Engineering and Management 147 (11), 04021154, 2021
412021
Integrating discrete event simulation and genetic algorithm optimization for bridge maintenance planning
MH Nili, H Taghaddos, B Zahraie
Automation in Construction 122, 103513, 2021
412021
Evaluating industrial modularization strategies: Local vs. overseas fabrication
AN Tak, H Taghaddos, A Mousaei, UR Hermann
Automation in construction 114, 103175, 2020
372020
From AutoCAD to 3ds Max: An automated approach for animating heavy lifting studies
Z Lei, H Taghaddos, SH Han, A Bouferguène, M Al-Hussein, U Hermann
Canadian Journal of Civil Engineering 42 (3), 190-198, 2015
362015
An A-Star algorithm for semi-optimization of crane location and configuration in modular construction
SM Bagheri, H Taghaddos, A Mousaei, F Shahnavaz, U Hermann
Automation in Construction 121, 103447, 2021
352021
Auction-based simulation for industrial crane operations
H Taghaddos, A Eslami, U Hermann, S AbouRizk, Y Mohamed
Automation in Construction 104, 107-119, 2019
322019
Integrated BIM-based simulation for automated time-space conflict management in construction projects
MS Dashti, M RezaZadeh, M Khanzadi, H Taghaddos
Automation in Construction 132, 103957, 2021
312021
The influence of craft workers’ educational attainment and experience level in fatal injuries prevention in construction projects
H Karimi, H Taghaddos
Safety science 117, 417-427, 2019
292019
Utilization of virtual reality visualizations on heavy mobile crane planning for modular construction
N Kayhani, H Taghaddos, M Noghabaee
arXiv preprint arXiv:1901.06248, 2019
292019
Integrated simulation-based scheduling for module assembly yard
H Taghaddos, S AbouRizk, Y Mohamed, R Hermann
Construction Research Congress 2009: Building a Sustainable Future, 1270-1279, 2009
272009
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20