Marc Uetz
Marc Uetz
Professor of Discrete Mathematics and Mathematical Programming, University of Twente
Bestätigte E-Mail-Adresse bei utwente.nl - Startseite
Titel
Zitiert von
Zitiert von
Jahr
An algorithm-based topographical biomaterials library to instruct cell fate
HV Unadkat, M Hulsman, K Cornelissen, BJ Papenburg, ...
Proceedings of the National Academy of Sciences 108 (40), 16565-16570, 2011
3072011
Solving project scheduling problems by minimum cut computations
RH Möhring, AS Schulz, F Stork, M Uetz
Management science 49 (3), 330-350, 2003
2562003
Approximation in stochastic scheduling: the power of LP-based priority policies
RH Möhring, AS Schulz, M Uetz
Journal of the ACM (JACM) 46 (6), 924-942, 1999
1911999
Models and algorithms for stochastic online scheduling
N Megow, M Uetz, T Vredeveld
Mathematics of Operations Research 31 (3), 513-525, 2006
1172006
Characterization of revenue equivalence
B Heydenreich, R Müller, M Uetz, RV Vohra
Econometrica 77 (1), 307-316, 2009
1042009
Games and mechanism design in machine scheduling—an introduction
B Heydenreich, R Müller, M Uetz
Production and Operations Management 16 (4), 437-454, 2007
852007
Stochastic machine scheduling with precedence constraints
M Skutella, M Uetz
SIAM Journal on Computing 34 (4), 788-802, 2005
852005
On project scheduling with irregular starting time costs
RH Möhring, AS Schulz, F Stork, M Uetz
Operations Research Letters 28 (4), 149-154, 2001
822001
Algorithms for deterministic and stochastic scheduling
M Uetz
Cuvillier, 2001
592001
Machine scheduling with resource dependent processing times
A Grigoriev, M Sviridenko, M Uetz
Mathematical programming 110 (1), 209-228, 2007
552007
On the generation of circuits and minimal forbidden sets
F Stork, M Uetz
Mathematical programming 102 (1), 185-203, 2005
472005
Resource-constrained project scheduling: Computing lower bounds by solving minimum cut problems
RH Möhring, AS Schulz, F Stork, M Uetz
European Symposium on Algorithms, 139-150, 1999
431999
How to sell a graph: Guidelines for graph retailers
A Grigoriev, J Van Loon, R Sitters, M Uetz
International Workshop on Graph-Theoretic Concepts in Computer Science, 125-136, 2006
372006
Resource constrained project scheduling with time windows: A branching scheme based on dynamic release dates
A Fest, RH Möhring, F Stork, M Uetz
Technical Report 596, Department of Mathematics, 1999
371999
Decentralization and mechanism design for online machine scheduling
B Heydenreich, R Müller, M Uetz
Scandinavian Workshop on Algorithm Theory, 136-147, 2006
352006
Scheduling precedence-constrained jobs with stochastic processing times on parallel machines
M Skutella, M Uetz
Proceedings of the twelfth annual ACM-SIAM symposium on Discrete algorithms …, 2001
352001
Unrelated parallel machine scheduling with resource dependent processing times
A Grigoriev, M Sviridenko, M Uetz
International Conference on Integer Programming and Combinatorial …, 2005
342005
Pricing network edges to cross a river
A Grigoriev, S Van Hoesel, AF Van Der Kraaij, M Uetz, M Bouhtou
International Workshop on Approximation and Online Algorithms, 140-153, 2004
342004
The price of anarchy for minsum related machine scheduling
R Hoeksma, M Uetz
International Workshop on Approximation and Online Algorithms, 261-273, 2011
292011
Unrelated machine scheduling with stochastic processing times
M Skutella, M Sviridenko, M Uetz
Mathematics of operations research 41 (3), 851-864, 2016
282016
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20