Follow
Jelena Ninic
Jelena Ninic
Associate Professor in Digital Engineering, University of Birmingham
Verified email at bham.ac.uk - Homepage
Title
Cited by
Cited by
Year
BIM, machine learning and computer vision techniques in underground construction: Current status and future perspectives
MQ Huang, J Ninić, QB Zhang
Tunnelling and Underground Space Technology 108, 103677, 2021
2912021
Recurrent neural networks and proper orthogonal decomposition with interval data for real-time predictions of mechanised tunnelling processes
S Freitag, BT Cao, J Ninić, G Meschke
Computers & Structures 207, 258-273, 2018
1092018
Model update and real-time steering of tunnel boring machines using simulation-based meta models
J Ninić, G Meschke
Tunnelling and Underground Space Technology 45, 138-152, 2015
832015
A hybrid finite element and surrogate modelling approach for simulation and monitoring supported TBM steering
J Ninic, S Freitag, G Meschke
Tunnelling and Underground Space Technology 63, 12–28, 2017
812017
Parallelized computational modeling of pile–soil interactions in mechanized tunneling
G Meschke, J Ninić, J Stascheit, A Alsahly
Engineering Structures 47, 35-44, 2013
632013
Multi-LOD BIM for underground metro station: Interoperability and design-to-design enhancement
MQ Huang, HM Zhu, J Ninić, QB Zhang
Tunnelling and Underground Space Technology 119, 104232, 2022
602022
Simulation based evaluation of time-variant loadings acting on tunnel linings during mechanized tunnel construction
J Ninić, G Meschke
Engineering Structures 135, 21–40, 2017
502017
Integrated parametric multi-level information and numerical modelling of mechanised tunnelling projects
J Ninić, C Koch, A Vonthron, W Tizani, M König
Advanced Engineering Informatics 43, 2020
492020
Computationally efficient simulation in urban mechanized tunneling based on multilevel BIM models
J Ninić, HG Bui, C Koch, G Meschke
Journal of Computing in Civil Engineering 33 (3), 04019007, 2019
482019
Beam–solid contact formulation for finite element analysis of pile–soil interaction with arbitrary discretization
J Ninić, J Stascheit, G Meschke
International Journal for Numerical and Analytical Methods in Geomechanics …, 2014
462014
An integrated platform for design and numerical analysis of shield tunnelling processes on different levels of detail
J Ninic, C Koch, J Stascheit
Advances in Engineering Software, 2017
452017
A review and analysis of testing and modeling practice of extended Hollo-Bolt blind bolt connections
M Cabrera, W Tizani, J Ninic
Journal of Constructional Steel Research 183, 106763, 2021
392021
From digital models to numerical analysis for mechanised tunnelling: a fully automated design-through-analysis workflow
J Ninić, A Alsahly, A Vonthron, HG Bui, C Koch, M König, G Meschke
Tunnelling and Underground Space Technology 107, 103622, 2021
352021
Experimental and numerical analysis of preload in Extended Hollo-Bolt blind bolts
M Cabrera, W Tizani, J Ninic, F Wang
Journal of Constructional Steel Research 186, 106885, 2021
332021
Hybrid surrogate modelling for mechanised tunnelling simulations with uncertain data
S Freitag, BT Cao, J Ninić, G Meschke
International Journal of Reliability and Safety 9 (2-3), 154-173, 2015
312015
BIM-to-IGA: A fully automatic design-through-analysis workflow for segmented tunnel linings
J Ninic, H Giang Bui, G Meschke
Advanced Engineering Informatics 46, 2020
302020
A framework for integrating embodied carbon assessment and construction feasibility in prefabricated stations
MQ Huang, XL Chen, J Ninić, Y Bai, QB Zhang
Tunnelling and Underground Space Technology 132, 104920, 2023
262023
Computational strategies for predictions of the soil-structure interaction during mechanized tunneling
J Ninić
242016
Recent progress, challenges and outlook for multidisciplinary structural optimization of aircraft and aerial vehicles
G Corrado, G Ntourmas, M Sferza, N Traiforos, A Arteiro, L Brown, ...
Progress in Aerospace Sciences 135, 100861, 2022
232022
Numerical Simulation in Mechanized Tunneling in Urban Environments in the Framework of a Tunnel Information Model
G Meschke, S Freitag, A Alsahly, J Ninic, S Schindler, C Koch
BAUINGENIEUR 89, 457-466, 2014
21*2014
The system can't perform the operation now. Try again later.
Articles 1–20